New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4507 H&J Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4507 H&J Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:33:12 AM
Creation date
7/24/2008 2:24:26 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004507
GL_Project_Number
985145
Identification_Number
2008100495
COE_Contract_Number
2008-00029
Retention_Destruction_Date
1/20/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> . <br /> PUBLIC IMPROVEMENT CONTRACT FOR USE WITH <br /> OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION <br /> BETWEEN: The City of Eugene, an Oregon <br /> Municipal Corporation (City) <br /> AND: H & J Construction, Inc. (Contractor) <br /> CONTRACT NO.: 2008-00029 <br /> JOB NO.: 4507 <br /> PROJECT: 2008 WASTEWATER REHABILITATION BASINS DW 21, DW 33-35, DW 44 <br /> AND VARIOUS LOCATIONS <br /> RECITALS <br /> Contractor was the successful bidder for the contract construction of the public improvement <br /> project described in the plans and specifications for the project that were included in the bid documents <br /> and the Oregon Standard Specifications for Construction which form a part of this contract. <br /> AGREEMENT <br /> 1. The Contract. The Contract between the City and Contractor (the "Contract") includes this <br /> Document and its exhibits, together with all of the documents and materials included in the definition <br /> of the "Contract" under the 2002 Oregon Standard Specifications for Construction issued by the <br /> Oregon Department of Transportation, as modified by the City's Amendments to the Specifications, <br /> Supplemental Specifications for the Project and any other Special Provisions included in the Bid <br /> Documents (all specifications and Special Provisions included in the Contract are collectively referred <br /> to herein as the "Specifications"). In addition, the Contract between the City and Contractor shall be <br /> deemed to incorporate all reports, records, laws, rules and orders referenced in the Contract <br /> documents. <br /> This Document includes and incorporates the following Exhibits: <br /> Exhibit A -City's Standard Conditions for Public Works Contracts <br /> Exhibit B -Proposal Documents <br /> Exhibit C -Certificate of Bidder/Contractor Employee Drug Testing Program <br /> 2. Definitions. Unless otherwise specifically defined in this Document, all capitalized terms which are <br /> not proper nouns shall have the meanings assigned thereto in the Specifications. <br /> " 3. Project. The project is generally described as: <br /> 2008 WASTEWATER REHABILITATION BASINS DW 21, DW 33-35, DW 44 AND VARIOUS <br /> LOCATIONS <br /> 4. Work to be Performed. Contractor agrees to furnish, as the "Work" all services, labor, materials <br /> and equipment which are described as the Contractor's responsibility in the Plans and Specifications, <br /> as the same may be modified in accordance with the Contract, and to construct the improvement <br /> described therein (the Project), all according to the provisions of the Contract. All parts of the Work <br /> are the sole responsibility of Contractor. <br /> Public Improvement Contract for Use with Oregon Standard Specifications -Page 1 0 R I G I 1 U A <br /> (Revised February 2004) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.