Billable Project Costs As Of 04/30/2008 <br /> <br /> 05/14/2008 4:48:50 PM Page 12 of 84 <br /> Project Billed Acti- Total Amount Billed <br /> <br /> Billed By vi TranDate TranId Resource Em~loyed uanti $Amount Transaction Remark <br /> <br /> 0870-12 3636212 288C Grading inspection (CE) $951.40 $957.40 <br /> 04!07/2008 Q6690012 Engineering Technician 2 3.2 L-H $224.00 INSTALL CONSTRUCTION ENTRANCE, <br /> EXCAVATE & BASE STREET <br /> 04/07/2008 Q6690012 CARGO VANS 3 H $16.50 INSTALL CONSTRUCTION ENTRANCE, <br /> EXCAVATE & BASE STREET <br /> 04/08/2008 Q6690013 Engineering Technician 2 3.2 L-H $224.00 INSTALL CONSTRUCTION ENTRANCE, <br /> EXCAVATE & BASE STREET <br /> 04/08/2008 Q6690013 CARGO VANS 3 H $16.50 INSTALL CONSTRUCTION ENTRANCE, <br /> EXCAVATE & BASE STREET <br /> 04/09/2008 Q6690014 Engineering Technician 2 2.6 L-H $182.00 INSTALL CONSTRUCTION ENTRANCE, <br /> EXCAVATE & BASESTREET <br /> 04/09/2008 Q6690014 CARGO VANS 2.6 H $14.30 INSTALL CONSTRUCTION ENTRANCE, <br /> EXCAVATE & BASE STREET <br /> 04/09/2008 Q6690094 Engineering Technician 2 0.6 L-H $42.00 GRADING INSPECTION <br /> 04/(0/2008 Q6690015 Engineering Technician 2 3 OS L-H $215.60 INSTALL CONSTRUCTION ENTRANCE, <br /> EXCAVATE & BASE STREET <br /> 04/10/2008 Q6690015 CARGO VANS 3 H $16.50 INSTALL CONSTRUCTION ENTRANCE, <br /> EXCAVATE & BASE STREET <br /> 289C Base inspection (CE) $235.88 $235.88 <br /> 04/08/2008 Q13630113 Sr Engineering Associate 0.5 L-H $45.00 SUBGRADE & BASE CONSTRUCTION <br /> 04/08/2008 Q13630113 4WD PICKUPS 0.5 H $3.88 SUBGRADE & BASE CONSTRUCTION <br /> 04/09/2008 Q13630304 Sr Engineering Associate 0.4 L-H $36.00 SUBGRADE AND BASE CONST. <br /> 04/24/2008 S6690075 Engineering Technician 2 2 L-H $140.00 CURB/GUTTER BASE ROCK PREPARATION <br /> 04/24/2008 56690075 CARGO VANS 2 H $11.00 CURB/GUTTER BASE ROCK PREPARATION <br /> 291C Drainage inspection (CE) $1,003.45 $1,003.45 <br /> 04/10/2008 Q13670105 Engineering Technician 2 1.5 L-H $105.00 STORM SEWER <br /> 04/10/2008 Q13670105 1/2 & 3/4 TON PICKUP 1.5 H $9.75 STORM SEWER <br /> 04/14/2008 R6690012 Engineering Technician 2 3.2 L-H $224.00 STORM SEWER PIPE INSTALLATION <br /> 04/14/2008 R6690012 CARGO VANS 3 H $16.50 STORM SEWER PIPE INSTALLATION <br /> 04/15/2008 R6690013 Engineering Technician 2 3.2 L-H $224.00 STORM SEWER PIPE INSTALLATION <br /> 04/15/2008 R6690013 CARGO VANS 3 H $16.50 STORM SEWER PIPE INSTALLATION <br /> 04/16/2008 R66900I4 Engineering Technician 2 3 L-H $210.00 STORM SEWER PIPE INSTALLATION <br /> 04!16!2008 R66900I4 CARGO VANS 3 H $16.50 STORM SEWER PIPE INSTALLATION <br /> 04/17/2008 R6690015 Engineering Technician 2 0.8 L-H $56.00 STORM SEWER PIPE INSTALLATION <br /> 04/17/2008 R6690015 CARGO VANS 0.8 H $4.40 STORM SEWER PIPE INSTALLATION <br /> 04/22!2008 SG690063 Engineering Technician 2 1.6 L-H $112.00 TYPE 4A INLET INSTALLATION <br /> 04/22/2008 56690063 CARGO VANS 1.6 H $8.80 TYPE 4A INLET INSTALLATION <br /> 292C PCC Inspection (CE) $1,061.35 $1,061.35 <br /> 04/25/2008 566900106 Engineering Technician 2 3.2 L-H $224.00 CURB/GUTTER CONCRETE PLACEMENT <br /> 04/25/2008 566900106 CARGO VANS 3.2 H $17.60 CURB/GUTTER CONCRETE PLACEMENT <br /> 04/25/2008 S66900126 Engineering Technician 2 0.77 L-H $53.90 CURB/GUTTER CONCRETE PLACEMENT <br /> 04/25/2008 S66900126 CARGO VANS 0.7 H $3.85 CURB/GUTTER CONCRETE PLACEMENT <br /> 04/28/2008 T6690012 Engineering Technician 2 3.2 L-H $224.00 CURB AND GUTTER PLACEMENT INSPECTION <br /> 04/28/2008 T6690012 CARGO VANS 2.8 H $15.40 CURB AND GUTTER PLACEMENT INSPECTION <br /> 04/29/2008 T6690013 Engineering Technician 2 2.8 L-H $196.00 CURB AND GUTTER PLACEMENT INSPECTION <br /> 04/29/2008 T6690013 CARGO VANS 2.8 H $15.40 CURB AND GUTTER PLACEMENT INSPECTION <br /> 04/30/2008 T1348084 Engineering Technician 2 0.8 L-H $56.00 CONTRETE SIDEWALK INSPECTION VALLEY <br /> <br />