Billable Project Costs As Of 05/31/2008 . <br /> <br /> 06/11/2008 3:40:01 PM Page 16 of 100 <br /> Project Billed Acti- Total Amount Billed <br /> <br /> Billed By vi TranDate TranId Resource Employed Quantity $Ainourn Transaction-Remark <br /> 0870-12 3636211 315C Final survey computations (CE) 5256.00 .8256.00 <br /> 05/08/2008 013680105 Associate Surveyor 3.2 L-H $256.00 CONCRETE QUANTIES DRAWING <br /> 324 Striping Layout 563.22 563.22 <br /> 05/19/2008 W1368032 Associate Surveyor 0.4 L-H $32.00 STOP BAR & HANDICAP WALK LAYOUT <br /> 05/19/2008 W1368032 CREW & 1 TON PICKUP 0.4 H $3.22 STOP BAR & HANDICAP WALK LAYOUT <br /> 05/19/2008 W6151032 Engineering Technician 2 0.4 L-H $28.00 STOP BAR & HANDICAP WALK LAYOUT <br /> 3636212 Insaections $2.915.55 2~.,-915.55 <br /> 218C Computations (quantities) (CE) 554.00 554.00 <br /> 05/21/2008 W61930144 Engineering Associate 0.6 L-H $54.00 FINAL STORM PIPE MEASUREMENTS <br /> 270C Final quantities (CE) 5140.00 5140.00 <br /> 05/28/2008 X6690094 Engineering Technician 2 0.4 L-H $28.00 PREPARE AS-BUILT <br /> 05/30/2008 X6690096 Engineering Technician 2 1.6 L-H $112.00 PREPARE AS-BUILT <br /> 289C Base inspection (CE) 5414.00 5474.00 <br /> 05/12/2008 V6690012 Engineering Technician 2 2.4 L-H $168.00 BASE ROCK GRADING INSPECTION <br /> 05/12/2008 V6690012 CARGO VANS 1.6 H $8.80 BASE ROCK GRADING INSPECTION <br /> 05/13/2008 V6690013 Engineering Technician 2 2.4 L-H $168.00 BASE ROCK GRADING INSPECTION <br /> 05/13/2008 V6690013 CARGO VANS 1.6 H $8.80 BASE ROCK GRAllING INSPECTION <br /> 05/14/2008 V6690014 Engineering Technician 2 0.8 L-H $56.00 BASE ROCK GRADING INSPECTION <br /> 05/14/2008 V6690014 CARGO VANS 0.8 H $4.40 BASE ROCK GRADING INSPECTION <br /> 290C Asphalt inspection (CE) 5604.00 5604.00 <br /> 05/14/2008 V6690084 CARGO VANS 2.8 H $15.40 PAVING INSPECTION <br /> 05/15/2008 V6690085 EngineeringTechnician2 2.8 L-H $196.00 PAVINGINSPECTION <br /> 05/16/2008 V66900I16 Engineering Technician 2 0.4 L-H $28.00 PAVING INSPECTION <br /> 05/16/2008 V66900116 CARGO VANS 0.4 H $2.20 PAVING INSPECTION <br /> 05/]6/2008 V6690086 Engineering Technician 2 3.2 L-H $224.00 PAVING INSPECTION <br /> 05/16/2008 V6690086 CARGO VANS 3.2 H $17.60 PAVING INSPECTION <br /> 05/19/2008 W6690012 Engineering Technician 2 1.2 L-H $84.00 ASPHALT PAVING INSPRCTION <br /> 05/19/2008 W6690012 CARGO VANS L2 H $6.60 ASPHALT PAVING INSPRCTION <br /> 05/23/2008 W6690016 Engineering Technician 2 0.4 L-H $28.00 ASPHALT PAVING INSPRCTION <br /> 05/23/2008 W6690016 CARGO VANS 0.4 H $2.20 ASPHALT PAVING INSPRCTION <br /> 291C Drainage inspection (CE) 5233.40 5233.40 <br /> 05/15/2008 V61930105 Engineering Associate 1 L-H $80.00 INSP. ASHALT TRENCH RESURFACING, <br /> DANEBO RD. <br /> 05/15/2008 V61930105 1/2 & 3/4 TON PICKUP 1 H $6.50 INSP. ASHALT TRENCH RESURFACING, <br /> DANEBO RD. <br /> 05/15/2008 V61930125 Engineering Associate 1 L-H $80.00 INSP. ASPHALT TRENCH RESURFACING, <br /> DANEBO RD. <br /> 05/15/2008 V61930125 I/2 & 3/4 TON PICKUP I H $6.50 INSP. ASPHALT TRENCH RESURFACING, <br /> DANEBO RD. <br /> 08/21/2008 W6690084 Engineering Technician 2 0.8 L-H $56.00 STORM SEWER FINAL MEASUREMENTS <br /> 05/21/2008 W6690084 CARGO VANS 0.8 H $4.40 STORM SEWER FINAL MEASUREMENTS <br /> 292C PCC Inspection (CE) 5505.95 5505.95 <br /> 05/01/2008 T1348085 Engineering Technician 2 3.2 L-H $224.00 CONTRETE SIDEWALK INSPECTION VALLEY <br /> GUTTER <br /> <br />