Run Date: 07/08/2008 10:28:20 Page 5 <br /> . City of Eugene <br /> . Contract Preliminary Progress Payment <br /> Payaieat No s 002 - <br /> Contractor: WILDISH CONSTRUCTION Original Contract: $926,017.00 <br /> Job 93-004433 Current Amount: $926,017.00 ~ <br /> Contract No: 2008-00022 Contract Award Date: 05/02/2008 <br /> PO 2008100425 Completion Date: 07/20/2008 <br /> Assessable: No <br /> Current Contract Hstimated Payment Cumulative Totals i Complete <br /> Line Description Last Chag Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0430 3/4" RIVER ROCK $80.00 TON 2.500 $200.00 0.000 $0.00 0.000 $0.00 0.00 <br /> PPP Barger DR fra® Bvy 99 to Altimont $392,371.00 $394,709.80 $398,909.80 <br /> <br /> General <br /> 0000 Liquidated Damages-Barger/Hwy ($310.00) DAY 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $20,000.00 LUMPSUM 1.000 $20,000.00 1.000 $20,000.00 1.000 $20,000.00 100.00 <br /> 0020 TEMP. WORT( ZONE TRAFFIC CONTRO $7,000.00 LUMPSUM 1.000 $7,000.00 0.200 $1,400.00 0.500 $3,500.00 50.00 <br /> 0030 TEMPORARY STRIPING $2,000.00 LUMPSUM 1.000 $2,000.00 1.000 $2,000.00 1.000 $2,000.00 100.00 <br /> 0040 FLAGGERS $37.00 HOUR 350.000 $12,950.00 315.500 $11,673.50 315.500 $11,673.50 90.00 <br /> 0050 EROSION CONTROL $700.00 LUMPSUM 1.000 $700.00 0.000 $0.00 0.500 $350.00 50.00 <br /> 0060 CITY PROVIDHD SPEC INFO SIGNS $150.00 EACH 4.000 $600.00 0.000 $0.00 4.000 $600.00 100.00 <br /> 0070 SURFACING STABILIZATION $90.00 CUYD 200.000 $18,000.00 632.700 $56,943.00 632.700 $56,943.00 316.00 <br /> <br /> 0080 ADJUSTING BOXBS $150.00 EACH 4.000 $600.00 1.000 $150.00 1.000 $150.00 25.00 <br /> <br /> 0090 MINOR ADJUSTMENT OF MANHOLES $1,200.00 EACH 6.000 $7,200.00 5.000 $6,000.00 5.000 $6,000.00 83.00 <br /> <br /> 0100 MH REM/REPL FRAME/COVER-WW $300.00 EACH 3.000 $900.00 2.000 $600.00 2.000 $600.00 67.00 <br /> <br /> 0110 MH REM/REPL FRAME/COVER-ST $300.00 SACH 3.000 $900.00 3.000 $900.00 3.000 $900.00 700.00 <br /> <br /> 0120 PAVEMENT REMOVAL $20.00 SQFT 18.000 $360.00 15.000 $300.00 15.000 $300.00 83.00 <br /> <br /> 0130 COLD PLANE PVMT REMOVAL, 2.5" $0.15 SQFT 86,400.000 $12,960.00 87,908.500 $13,186.28 87,900.500 513,186.28 102.00 <br /> <br /> 0140 LEVEL 3 1/2" DENSE HMAC $58 00 TON 1 400 000 $81 200.00 1 261.720 $73 179.76 1,261.720 $73,179.76 90.00 <br /> <br /> 0150 WIDE CURB AND GUTTER $40.00 FOOT 12.000 $480.00 12.000 $480.00 12.000 $480.00 100.00 <br /> <br /> 0160 CONCRETE CURBS $30.00 FOOT 21.000 $630.00 21.500 $645.00 21.500 $645.00 102.00 <br /> <br /> 0170 CONCRETH CURB AND GUTTER $100.00 FOOT 5.000 5500.00 5.000 $500.00 5.000 $500.00 100.00 <br /> <br /> 0180 CONCRETE WALKS $15.00 SQFT 120.000 $1,800.00 117.300 $1,759.50 117.300 $1,759.50 98.00 <br /> <br /> 0190 TRUNCATED DOMES $25.00 SQFT 10.000 $250.00 10.000 $250.00 10.000 $250.00 100.00 <br /> <br />