Run Date: 07/03/2008 08:34:46 <br /> Page 2 <br /> ' City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 002 ~ _ <br /> Contractor: wILDI$ti-CQNSTRUCTSOH. ~ 6tiginal ConEracEd $977,090.70 <br /> Job 93-009417 <br /> <br /> . Contrast- Net. _2A98-A6939-~---°-----------.- S1TrEnY amn,.,,r ~ _-_-_59.Z7-.494-~1II--------------. <br /> Contract Award Date: 03 27 2008 T~ <br /> PO 2008100380 / / <br /> Assessable: No Completion Date: 09/20/2008 ~ ~ <br /> Current Contract Hstimated payment Cumulative Totals 8 Complete <br /> Line Description Last Chag Ord Unit Price Unit Measure Quantity Amount Quantity - Amount <br /> Quantity Amount <br /> AIRPORT-TERMINAL RUMP REHAB <br /> Base Hid <br /> 0000 Liquidated Damages ($1,000.00) DAY <br /> o.oao $o.oo o.ooa $o.oo o.ooo So.oo o.oo <br /> 0010 MOBILIZATION $94,000.00 LUMPSUM 1.000 $94,000.00 1.000 $94,000.00 1.000 $94,000.00 100.00 <br /> 0020 EROSION CONTROL $3,500.00 LUMPSUM 1.000 $3,500.00 0.800 $2,800.00 0.800 $2,800.00 80.00 <br /> 0030 AIRPORT SAFETY AND SECURITY $83,000.00 LUMPSUM 1.000 $83,000.00 0.350 $29,050.00 0.500 $41,s00.00 50.00 <br /> 0040 CONCRETE DEMO AND REMOVAL $9.00 SQYD 7,341.000 $66,069.00 3,634.000 $32,706.00 3,634.000 $32,706.00 50.00 <br /> 0050 HMAC COLD PLANING $8.00 SQYD 1,050.000 $8,400.00 346.000 $2,768.00 346.000 $2,768.00 33.00 <br /> 0060 ECONOCRSTE $100.00 CUYD 50.000 $5,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0070 PCC PAVEMENT $76.50 SQYD 7,172.000 $548,658.00 636.000 $48,654.00 636.000 $48,659.00 M 9.00 <br /> ooeo ADJUST JDNCrION BOX $soo.oo EAC}i l.aoo Ssoo.oo l.ooo_ $soo.oo l.ooo $soo.oo loo 00 <br /> 0090 HMAC $76.00 TON 600.000 $45,600.00 268.760 $20,426.76 268.760 $20,425.76 45.00 <br /> 0100 PREFORMED JOINT SBAL $8.00 FT 8,000.000 $64,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0110 OBLITERATE EKISTING MARKING $2.25 SQFT 3,500.000 $7,875.00 2,248.000 $5,058.00 2,248.000 $5, OS8.00 64.00 <br /> 0120 PAVEMENT MARKING $1.65 SQFT 13,000.000 $21,450.00 1,386.500 $2,287.73 1,386.500 $2,287.73 11.00 <br /> Alt-3 Concrete Driveway Replacement <br /> 0160 CONCRETE DRIVEWAY REPLACEMENT $68.00 SQYD 226.000 $15,300.00 242.500 $16,490.00 242.600 $16,490.00 108.00 <br /> Alt-1 High Frequency Demoli tioa <br /> 0170 MOBILIZATION-RUBBLZZING EQUIPM $4,300.00 EACH 2.000 $8,600.00 1.000 $4,300.00 1.000 $9,300.00 50.00 <br /> 0180 PAVEMENT RUBBLIZING $0.70 SQYD 7,341.000 $6,138.70 3,601.000 $2,520.70 3,601.000 $2,520.70 49.00 <br /> $977,090.70 $261,560.19 $274,010.19 <br /> <br />