Billable Project Costs As Of 05/31 /2008 <br /> UGI1312f)08 3r4fl:f30 PM - - <br /> _ Pam s ~ wa <br /> - - - _ <br /> - _ <br /> Project Billed Acti- `Total Am~llllt Bitted <br /> Billed By vi Tranllate TranId Resource Employed uanti $Amolmt Transaction Remark <br /> 0406 PPP 27th. (4342) $476.88 $476.88 W~~ <br /> 3636213 Materials Testine • <br /> 476.88 $47b.88 <br /> 187C CCQuality control (CE) 5190.63 $190.63 <br /> I1Do8 ~ W 13560106 Engineering Technician 2 2.5 L-H $175.00 PCC SAMPLING & TESTING <br /> ;fl~B ' W13560106 PASSENGER VANS 2.5 H $15.63 PCC SAMPLING & TESTING <br /> 322-7 Concrete sample pickup 5286.25 $286.25 <br /> 05/24/2008 X1356027 PASSENGER VANS 1 H $6.25 P/U PCC CYLS CAST 5/23/08 AND BREAK <br /> 05/26/2008 X1356022 Engineering Technician 2 4 L-H $280.00 P/U PCC CYLS CAST 5/23/08 AND BREAK <br /> <br /> -;mow <br /> <br />