V~ <br /> Run Date: 3/12/2008 Page 1 <br /> City of Eugene <br /> Bid Tabulation <br /> Bid N2006-OOOOD9 <br /> Job No. 93-009417 <br /> EUGENE AIRPORT - TEAMINAL RAMP RECONSTRUCTION, SECTION 1 <br /> HOgineer's 5stimate Wildish Construction Brown Cont ract inc Knife River ACME Concrete Pavinc CPM Development <br /> Line <br /> N0~ DescriR ion QOantity 1~D1L Unit Price AIOOyDk. Unit Price HI6gy11L Unit Price Amount Unit Price ~g0ypt_ nn it <br />Price Bmount Qnit Price pmquDt_ <br /> Bun Bid <br /> 10 MOBILIZATION 1 LUMPSUM $100,000.00 $100,000.00 594,000.00 $94,000.00 $111,000.00 5111,0O0.DD $19,S0D.00 579,500.00 5305,000.00 5305,000.00 <br /> $155,000.00 $155,00D.DD <br /> 20 ERDSION CONTROL 1 LUMPSIIM $2,000.00 $2,000.00 53,500.00 $3,5DD.D0 $2,000.00 S2,0DD.DD 52,500.00 52,500.00 $1,100.00 $1,100.00 S2,ODD.00 <br /> $2,000.00 <br /> 30 AIRPORT SAFETY AND SECURITY 1 LUMPSUM $60,0DD.00 $60,000.00 583,000.00 $83,000.00 $29,000.00 $29,000.00 $100,000.00 5100,000.00 5105,000.00 $105,00 <br />.00 $12D,000.00 $120,000.00 <br /> 90 CONCRETE DEMO AND REMOVAL 7341 SQYD $10.00 573,910.00 59.00 566,069.00 $25.DD 5183,525.00 519.00 5102,774.00 523.50 $172,513.50 <br /> $29.50 $179,854.50 <br /> 50 F@fAC COLD PLANING 1050 SQYD 57.00 57,350.00 58.00 $8,400.00 526.DD $27,300.00 516.00 516,800.00 514.00 519,700.00 $18.00 <br /> 518,900.00 <br /> 60 ECONOCRETE 50 CUYD 5125.00 56,250.00 S1DD.DD SS,000.DD $257.40 $12,850.00 $190.00 57,000.00 $270.00 $13,500.00 5140.00 $7,000.00 <br /> 70 PCC PAVEMENT 7172 SQYD 590.00 5695,980.00 576.50 5598,658.00 $77.00 5552,299.00 5106.00 5760,232.00 586.00 5616,792.00 $1D6.DD 5779,576.00 <br /> BO ADJUST JUNCTION BOX 1 EACH $500.00 5500.00 SSDD.4D SSD0.00 $780.00 S7PO.OD 51,000.00 51,000.00 51, 150. D0 51,150.00 $1,100.00 <br /> 51,100.00 <br /> 90 HMAC 6DD TON 5100.00 560,000.00 $76.00 $45,6DD.DD 5125.00 575,000.00 575.00 S95,000.DD 5105.00 $63,000.00 590.00 559,000.00 <br /> lOD PREFORMED JOINT SEAL 8000 FT $6.00 598,000.00 58.00 $64,000.00 $7.00 $56,000.00 57.00 SS6,DOD.DO $9.25 $39,000.00 56.25 550,000.00 <br /> 110 OBLITERATE EXISTING MARKING 3500 SQFT 52.00 $7,000.00 52.25 57,875.00 52.75 59,625.00 $2.50 $8,75D.D0 $1.15 59,025.00 $2.9D <br /> $10,150.00 <br /> 120 PAVEMENT MARKING 13000 SQFT $1.25 $16,250.00 51.65 $21,950.D4 $2.00 526,000.00 $1.75 522,750.00 50.95 $5,650.00 $2.25 529,250.00 <br /> Total: ease Bid S1,026,240.D0 $948,052.00 51,085,324.00 $1,197,306.00 $1,336,630.50 $1,401,830.50 <br /> <br /> Alt-1 81gh Frequency Demolition <br /> 130 MOBILIZATION - RUBBLIZING EQUIPMENT 2 EACH $5,000.00 510,000.00 54,300.OD SB,644.0D $9,000.00 $16,000.00 $8,000.00 516,000.00 510,000.00 520,000.00 <br /> 51.00 52.00 <br /> 140 PAVEMENT RUBBLIZING 7341 SQYD 52.00 $19,662.00 50.70 55,138.70 (51.30) ($9,593.30) 51.40 510,277.40 $3.D0 522,023.00 50.01 <br /> $73.91 <br /> Total: Alt-1 Righ Frequency Demolition $24,682.00 $13,738.70 $8,456.70 $26,277.40 $42,023.00 $75.41 <br /> <br /> Alt-2 Concrete Driveway Overlay <br /> 150 CONCRETE DRIVEWAY OVERLAY 225 SQYD 575.00 516,875.00 586.00 519,800.00 582.00 518,950.00 5140.00 531,500.00 $100.00 522,500.00 5170.00 <br /> 538,250.00 <br /> Total: Alt-2 Concrete Driveway Overlay 516,875.00 $19,800.00 $18,450.00 $31,500.00 $22,500.00 $38,250.00 <br /> <br /> Alt-3 Concrete Driveway Replacement <br /> 160 CONCRETE DRIVEWAY REPLACEMENT 225 SQYD 550.00 511,250.00 568.00 $15,300.00 566.00 514,850.00 595.00 521,375.00 $122.00 527,450.00 <br /> $190.00 $31,500.00 <br /> Total: Alt-3 Concrete Driveway Replacement $11,250.00 $15,300.00 $14,850.00 $21,375.OD $27,450.00 $31,SDO.DD <br /> A <br /> i <br /> <br />