r <br /> <br /> i~ <br /> PeggY~ <br /> We are ready to do one additional drawdown using the ASAP system to get reimbursement revenue from ' <br /> the BLM. I will send you a photocopy of the entire packet of materials (including the cover letter and SF <br /> 270) that I mail to BLM, plus a copy of the "project expenses spreadsheet" from CAMS that shows all the <br /> r eligible expenses, this afternoon. Here are the details on this drawdown. <br /> r <br /> $4,928.53 for Task Order HEF031 M03 (City of Eugene Contract 2004-05414). In BLM lingo, this may be <br /> known as Task Order HEF031 M03001. This money was used to hire contractors to conduct geotechnical <br /> surveys for the future Wetlands Education Center. All work was charged to GJN 4107 (Wetlands <br /> Education Center). There will be a balance of $0.00 on this Task Order after this drawdown. Please note <br /> that this is the second (and final) drawdown for this task order. We previously billed BLM for $18,071.47 <br /> back in October, 2004. <br /> The Voice Response System (VRS) number for this Task Order is 013875. <br /> Eric <br /> Eric N. Wold <br /> Wetlands Program Supervisor <br /> City of Eugene, Parks and Open Space Division <br /> 1820 Roosevelt Blvd. <br /> Eugene, OR 97402-4159 <br /> Phone: (541) 682-4888 <br /> Fax: (541) 682-4882 <br /> Email: eric.n.wold@ci.eugene.or.us <br /> I <br /> i <br /> i <br /> i <br /> i <br /> 'I <br /> i <br /> 2 <br /> <br />