i <br /> I~ <br /> I <br /> <br /> Ac founts Receivable'Workshee <br /> <br /> Chy f Eugene -Public Works T~anspoKation <br /> ~~20 oosevelrBlvd. ' Send to: Date: <br /> <br /> Eyge e, oR 9T~o2 Address: Southeast corner of Royal & Bertelson <br /> Description: Install ADA access ramp <br /> Account Code: <br /> OR: <br /> ' Hourly Fringe Base Hours Total Subtotals <br /> Employee Rate + Rates = Rate x Worked = _ <br /> F ME Em to ees: 35. 5% <br /> 0.00 0.00 0.00 Total Wa es 0.00 <br /> 0.00 0.00 0.00 <br /> 0.00 0.00 0.00 <br /> 0.00 0.00 0.00 Total Overhd <br /> 0.00 0.00 0.00 17.59% 0.00 <br /> xe t Em Io ees: 35.40% <br /> 0.00 0.00 0.00 <br /> 'F ME Em .OT: 35.09?/° 0.00 0.00 1.00 0.00 <br /> Te Em to ees 7.65°k 0.00 0.00 0.00 <br /> Total Hou <br /> ea th Frin no-OT-full- ime 3.59 0.00 0 <br /> Hea th Fdn a no OT- t-20 4.50 0 <br /> Heath Frin a no OT- t-30 3.00 0 <br /> LABORI TOTAL: 0.00 <br /> Indirect Overhead °k <br /> Hourly Total qu p. General 11 24.64% <br /> Equipment Ty Rate x Hours = Charge Road 131 13.71 <br /> 7101 17 Backhoe 22.81 3.00 68.43 Sewer 533-534-535 15.18% <br /> of 45 5 d dum truck ' 16.90 3.00 50.70 Fleet 619 17.08% <br /> 304 45 one ton truck 9.02 4.00 36.08 Transportation 131 17.59% <br /> 0.00 Materials 10.00% <br /> 0.00 <br /> 0.00 <br /> 0.00 <br /> 0.00 <br /> EQUIPMEN TOTAL: <br /> TERIALS: <br /> Actual # of Overhd Material <br /> Material Type Cost x Units + 10% = Charge <br /> 0.00 0.00 <br /> 0.00 0.00 <br /> 0.00 0.00 <br /> 0.00 0.00 <br /> 0.00 0.00 <br /> 0.00 0.00 INVOICE TOTAL: <br /> 0.00 0.00 Labor <br /> 0.00 0.00 Charges 0.00 <br /> 0.00 0.00 Equipment <br /> 0.00 0.00 Charges <br /> 0.00 0.00 Material <br /> 0.00 0.00 Charges 0.00 <br /> MATERIAL TOTAL: 0.00 TOTAL: <br /> bill ngworksheetPW M.mstr.Transp.external.xls <br /> <br />