New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
AJE58848
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
AJE58848
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2008 11:36:38 AM
Creation date
7/14/2008 11:36:38 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Journal Entry
PW_Active
Yes
External_View
No
GJN
004003
GL_Project_Number
915046
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 2 <br /> From: CAHILL Michelle R ! <br /> Sent: Tuesday, July 31, 2007 2:51 PM <br /> To: CLOYES Gary A <br /> <br /> - Cc: MILOVICH Scott R; SMITH Tammy D <br /> Subject: Delta Ponds VAC X discharge to the WW system <br /> Gary - <br /> I think we discharged about 18,000 gallons into the WW system Saturday and so we should pay you (MWMC) <br /> about $54. How I got there was.:. <br /> Vac-X discharged into the EBI ww pipe on Goodpasture Island Road Saturday July 28th from about 9:30 to <br /> 12:30.. Their average pump rate was 80 gpm. ! <br /> So I figure <br /> 3 hours x 60 min/hr = 180 min <br /> 180 minx 80 gal /min = 14,400 gals <br /> They also had a few periods in that time that they pumped about 200 gpm. I'd estimate total time of that was 30 <br /> minutes. It was during the 3 hours so... I, <br /> 120 gal/minx 30 min =3,600 gals <br /> • To ether that makes 18 000 allons at 3.00/1.000 al I <br /> 9 g $ g get $54. <br /> Did I calc that right? <br /> The Delta Ponds project will pay this cost by Journal Entry. Tammy Smith is willing to do it if we can tell her the <br /> account the funds should get transferred to. Or, if someone in WW wants to do the AJE then they can take the <br /> - $54 out of 531-9332-61739. <br /> Tammy and Scott should get a record of the AJE if you do it on the WW Div. side. <br /> THANKS so much for working with us on this "emergency discharge" so we could keep the work <br /> going. Especially thanks. for taking time when you were out of the office to call back and work with me: <br /> me <br /> Michelle Cahill <br /> Principal Civil Engineer <br /> Public Works Engineering I, <br /> City of Eugene <br /> 244 E Broadway <br /> Eugene Oregon 97409 i~ <br /> (541) 682-6855 <br /> I <br /> (541) 682-8410 (fax) I <br /> i <br /> I <br /> 8/2/2007 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.