New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4500 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4500 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 9:18:00 AM
Creation date
7/11/2008 9:16:09 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004500
GL_Project_Number
374500
Identification_Number
Begin Warranty
COE_Contract_Number
2008-00510
Retention_Destruction_Date
3/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Not fication of Commencement and <br /> Public Works <br /> CO pletion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DA E CONTRACT NO. <br /> 3/3/ 008 i 2008-510 <br /> PR JECT NAME ~ JOB NO. <br /> Cre t Meadows ' 4500 <br /> C TRACTOR FEDERAL AID PROJECT NO. <br /> Ki ,inc., 90465 Woodruff Street, Eugene, OR 97402 <br /> IN PECTOR PHONE NUMBER DATE OF AWARD <br /> GI A. Fee 541-682-5195 <br /> FIR T NOTIFICATION <br /> 10/2 7 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SE OND NOTIFICATION <br /> SPE IFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED 8 THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 2/13/2008 <br /> ALL LAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br /> (SE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS) <br /> Inspector Signature <br /> THI D NOTIFICATION <br /> Noti a of Completion. Begin Warranty Period. <br /> 3/0 8 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> P T REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQ IRED UNDER THE (70NTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN A CORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK IS GUARANTEED / <br /> BY T E CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE v <br /> WAR IES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> ONE EAR. THE CONTRAjCTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br /> BEC ME EVIDENT WITHI~ THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE NE-YEAR ARRANTY <br /> PERT D WILL BE REQUIR D TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE R P VQ <br /> Inspector i ture Q <br /> I <br /> For Privately Engineered Projects Only <br /> Engi eer: Poage Engineering & Surveying, Inc. <br /> Add ss: P.O. BOX 2527 <br /> Eugene, OR 97402 - <br /> Ow r: Rushmore Group, LLC <br /> Add ss: 90465 Woodruff Street <br /> Eugene, OR 97402 <br /> DIST IBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager Q~~ File Damon Joyner, PWM <br /> ADDI IONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> - ~ <br /> <br /> Q:1PR ~ ECTS\PRO)-OW500~Correspondence\Contractors\4500 20080303 Third Notification.doc APRiL 2004 <br /> (vim <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.