New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4449 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4449 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 9:50:48 AM
Creation date
7/10/2008 1:31:52 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004449
GL_Project_Number
374449
Identification_Number
Begin Warranty
COE_Contract_Number
2007-00515
Retention_Destruction_Date
12/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I I <br /> V <br /> Nc~t~fication of ommencement and Public Works <br /> Completion Dat s for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> QA E CONTRACT NO. <br /> 1 Z 0/2007 2007-515 <br /> PR JECT NAME JOB NO. <br /> ~u~hnellLane 4449 <br /> C NTRACTOR FEDERAL AID PROJECT N0. <br /> iE ene Sand & Grav ,Inc., P.O. BOX 1067, Eugene, OR 97440 <br /> IN PECTOR PHONE NUMBER DATE OF AWARD <br /> iGl n A. Fee 541-682-5195 <br /> FI ST NOTIFICATI N <br /> 5-8,2007 IS THE DATE O WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> S~COND NOTIFIC ION <br /> SPECIFIED COMPLETIO DATE (S) (FROM SECT. 00180.50) DAYS CFIARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED 8 THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 9/19/2007 <br /> ALI CLAIMS FOR ADDI NAL COMPENSATION MUST BE SUBMITTED BY: <br /> (SSE SUBSECTION 001 .30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATI N <br /> Ngtice of Completi n. Begin Warranty Period. <br /> ~m~bar 6, 2007 IS TH DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> r4aty l REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> RI~QUIRED UNDER TH CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WI SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT t13, ALL WORK IS GUARANTEED BY THE <br /> C NTRACTOR FOR O E YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> R MAIN IN EFFECT FO THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> T E CONTRAGTOR IS ESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WO THAT BECOME EVIDENT <br /> W HIN THE ONE-Y WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR W PE IOD LL BE <br /> REQUIRED TO BE GU EED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> i <br /> Inspector ig ature <br /> For Privately Engineered Projects Only <br /> E' gineer: Page Engineering & Surveying, Inc. <br /> A~dress: P. .BOX 2527 <br /> I. E gene, OR 97402 <br /> f <br /> i <br /> er: S veGross 12-1 '-U7 FlU9:06 <br /> dress: 3 5 Walnut Lane <br /> E gene, OR 97401 <br /> ~ DISTRIBUTION FOR FI ST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Constriction Manager File Damon Joyner, PWM <br /> ADDITIONAL DISTRIB TION FOR THIRD NOTIFICATION: .J <br /> Maintenance-PI nning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> <br /> Q:\PROJECTS\PROJ-9 9\CorrespondencelContractorsW449 20071206 Third Notification.doc APRIL 2004 n6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.