' iw'" <br /> Public Works <br /> wily Progres Report Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> ) N / r j! (541)682-5560 <br /> P~iOJECT l~~ /V CONTRACT: v~~~ JOB NO. y <br /> DWTE 0 INSPECTOR ~r~~ SHIFT S T W T F S <br /> W ATHER NUMBER OF PERSONNEL AND MAJOR EQUIPMENT <br /> CUEAR FAIR CLOD SHOWER RAIN SNOW <br /> T~MP. TO 32 50.70 70-85 OVER 85 ~ @ ~ ~ m a m <br /> ~ ms ~ ~ <br /> D~IYCOUNT YES NO 1/2 ~ R t' .8 ~ $ E E £ N v <br /> C MPLETION DATE: ~ ~ ~ aB 8 m c3 c`3 v 0 8 ~ ~ ~ a~ ~ ~ ~ ~ ~ ~ <br /> C NTRACTOR 8 SU HRS <br /> L CATION AND DES RIPTION OF WORK IoM TOTAL CUMOU <br /> ~TIVE <br /> R MARKS - Conditbn of tratflc control and roadway; Important discusabns with contractor, rejected vuork or materiels and reasons; delays; difflcultles; ecciderNa; <br /> ud ty damages and other u suet conditions or everts; antvals and departures d major equipment; visitors. <br /> ' _ <br /> I <br /> i <br /> i <br /> i <br /> i <br /> y <br /> E ION <br /> TRAFFIC CONTROL <br /> j VISITORS <br /> CANTINUED ON PA E 2: i <br /> ~ YES ? NO MEMO PREPARED: ? YES ? NO # !k, <br /> <br /> ENO FORM 1021 Whfte! File Yellow! Inspector ?AA7/AHY2A7C U,~- <br /> <br />