New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4443 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4443 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 9:48:27 AM
Creation date
7/10/2008 12:00:25 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004443
GL_Project_Number
374443
Identification_Number
Begin Warranty
COE_Contract_Number
2007-00512
Retention_Destruction_Date
12/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
; ~ <br /> ' tification of Commencement and <br /> N O Public Works <br /> <br /> Cpmpletion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> 4ATE CONTRACT NO. <br /> 6/2007 2007-512 <br /> t~ROJECT NAME JOB NO. <br /> Slocum Center Striping ~ <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> ~ gge Sand and Gravel, Inc. <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Ien A. Fee 541-682-5195 <br /> I FIRST NOTIFICATION <br /> January 23, 2007 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> Sf~ECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> Fetwary 6, 2007 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMRTED BY: <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> ~14tice of Completion. Begin Warranty Period. <br /> December 7, 2007 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> 1N ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br /> WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR RANTY PE OD WILL BE <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> Ins Signature <br /> For Privately Engineered Projects Only <br /> Engineer: JRH Transportation Engineering <br /> Address: 4765 Village Plaza Loop, Suite 201 <br /> Eugene, OR 97401 I ~ I i _ , y : ; l <br /> (?caner: Steve Korth <br /> Address: 2350 Oakmont Wy. #204, Eugene, OR 97401 <br /> Eugene, OR 97401 <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager n~ File Damon Joyner, PWM <br /> ADbIT10NAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> Q:WROJECTSIPROJ-314443\Correspondence\Contractors14443 20070206 Third Notification.doc APRIL 2004 ~g <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.