New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4408 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4408 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 4:33:27 PM
Creation date
7/10/2008 11:08:47 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004408
GL_Project_Number
374408
Identification_Number
Begin Warranty
COE_Contract_Number
2007-00501
Retention_Destruction_Date
11/2/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I Y <br /> Igo ifica ' <br /> ~ tlon of Commencement and <br /> Public Works <br /> completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> DATE CONTRACT NO. <br /> ,11 /2/2006 2007-501 <br /> PROJECT NAME JOB NO. <br /> NVASTEWATER EXTENSION FILBERT AVE 4408 <br /> ~C~NTRACTOR FEDERAL AID PROJECT NO. <br /> D LE PICK, CONSTRUCTION INC : 30667 WYATT DR, HARRISBURG,OR 97446 N/A <br /> ,IN6PECTOR PHONE NUMBER DATE OF AWARD <br /> ?M HAEL E. WILSON 541 682-2748 4-06-06 <br /> I~IF~ST NOTIFICATION <br /> 9/2/06 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> I <br /> $E~OND NOTIFICATION <br /> I <br /> ~P~CIFI(=D COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> N/A <br /> AFL ~LAIMS FOR ADDITIONAL t~OMPENSATION MUST BE SUBMITTED BY: N/A <br /> ($E SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> TIHI~D NOTIFICATION <br /> Nonce of Completion. Begin Warranty Period. 1 1-0 6- 0 6 A 0 6: 0 t) I N <br /> 1 /2t/0615 THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> P~IIJJT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> R~(~JIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1 AND #2, ALL WORK IS GUARANTEED <br /> 61I E CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> NIA~RANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> ONEI YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br /> B~CpME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE NE YEAR WAR NTY <br /> P~R)OD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE EP~4lR ~ JC~~~G <br /> ~ <br /> i <br /> Inspector Signature <br /> For Privately Engineered Projects Only <br /> i <br /> Eng}neer: THE FAVREAU GROUP CIVIL ENGINEERING <br /> A~1d~ess: 3712 NORWICH AVE <br /> EUGENE, OREGON 97408 <br /> Owner: TIM W. MURPY <br /> Address: P.O. BOX 233 <br /> DEXTER, OREGON 97431 <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> <br /> O:\PROJECTS\PROJ-8\44081Correspondence\Contractors\440820061102MEWFirst Second Third Notification.doc APRIL 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.