Engineering and <br /> Construction Agreement ~ ~ ~ P~a~ works <br /> Engineering <br /> ~ ~ City of Eugene <br /> 858 Pearl <br /> Job Number. - Contract Number. Eugene, OR 9401 <br /> (541)682-5291 <br /> Capital Project Number. Fes: (541)682-5032 <br /> i <br /> ,Tl~e undersigned Owner requests the Public Improvements as described below: <br /> Type of improvement: Wastewater <br /> (Paving, wastewater, stormtnater, street lights) <br /> Location: The Fountains of Park Place <br /> (Sheet or easemen>~ g a subdivision, print subdivision name) <br /> North or east limit South or west limit <br /> (except for subdivisions) (except for subdivisions) <br /> IDe designed and constructed during the or subsequent construction season in the following manner (check one): <br /> r~r~ <br /> O 1. As a City engineered and cortstrueted project (digibie for assessment financing), <br /> City agrees: <br /> a) to perform engineering design, cast estimate, award of contract, construction inspection, and assessment <br /> tabulation for the tmprovemerrts; <br /> b) to particlpate in the cost of necessary additional capaaty of improvements beyond the assessable amounts <br /> as stipulated in the Eugene Municipal Code. <br /> Owner agrees: <br /> ' a) to pay all engineering and won costs which are not eligible for assessment financing. <br /> b)If the undersigned owner chooses to discontinue the City engineering ar>~i construction process prior to <br /> execution of a construction contract, the owner further agrees m pay all Engineering and otherproject-related <br /> I ~ incurred by the City to that point, and to comply with paragraph 2 below,If applicable. <br /> 2. As a privatNy engineered and constructed project with private financing arranged by the pwner. <br /> Owner agrees: <br /> ~ a) to install ati required public improvements at no cyst to the City; <br /> I, b) to pay acdrat City ~ incurred for plan review and processing, inspection, materials testing. and other <br /> engineering services, aU of which wilt be bii{ed and payable moniftly with final payment due prior m City's <br /> final acceptance of the completed improvements. <br /> I c) to provide the City a bond, which includes acne-year warranty period, in an amount sufficient to cover all engineering and <br /> construction costs associated with completion of the required public improvements. <br /> I, d} to pay other charges and levies for public improvements, if required. Other charges may include, but are not limited to: <br /> 1) penalty charges: in the event the properly owner fails to make payment when due under this a9nyement, ~e P~Ky <br /> ~ owner shall be charged a penalty in the amount of S25 or ten percent (10°6) of the past due amount, whichever is <br /> ' greater. Payment of the penalty shall not consitute a waiver by the City of its other remedies. <br /> 2) interest charges: property owner shall pay interest on all past due amounts at the rate of ei Meen rcent 18°k <br /> 9 Pe ( ) <br /> per annum from the due date until paid. This sum shall be in addition to penalty charges. <br /> OWNER CO~OWNER CITY OF ENE <br /> OWNERS NAME lPrMU CO.OYVNER'S NAME (pn~t) SIGNATURE <br /> v~~ m ~a ~-~rt~. ~t~ p~b1 iG U~o~ <br /> SIGNATURE SIGNATURE T17~ <br /> 3130 /o~ <br /> ~ DATE a,T•~ <br /> 2315' Park View Drive <br /> m PEARL STREET <br /> ~ nR 97408 EUGENE, OREGON 97401 <br /> /YIP CITY /STATE / Z1P <br /> 541-34'~-'~ Sfi 1 <br /> PHONE NUMBER (btainess hours) PHONE NUMBER (business hours) <br /> <br /> EINC~(429) ORIGINAL/CITY YELLOW/OWNER PINK/INSPECTOR FEBRUARY2002 <br /> <br />