New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4387 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4387 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:54:18 PM
Creation date
7/10/2008 10:31:19 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004387
GL_Project_Number
374387
Identification_Number
Begin Warranty
COE_Contract_Number
2006-00510
Retention_Destruction_Date
1/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
V~' <br /> Notification of Commencement and PubllcWorks <br /> <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> ~I Eugene, OR 97401 <br /> (541) 682-5560 <br /> DATE CONTRACT NO. <br /> 1/17/2007 2006-510 <br /> PROJECT NAME JOB NO. <br /> Alpine Court Multi-use Path 4387 <br /> CONTRACTOR ' FEDERAL AID PROJECT N0. <br /> KDA Construction, 372$1 Fairview Industrial Drive SE, Suite 196, Salem, OR 97302 <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Glen A. Fee 541-682-5195 <br /> FIRST NOTIFICATIdN <br /> 11/27/ZOOfi IS THE DATE bN WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICA~'ION <br /> SPECIFIED COMPLETIO~J DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED ~ THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 12/28!2006 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br /> (SEE SUBSECTION 0019.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATI N <br /> Notice of Completi11 n. Begin Warranty Period. <br /> .January 8, 2007 IS THE tyATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITS' CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THEE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITHI SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT ia3, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR O E YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN IN EFFECT F THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR IS ESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br /> WITHIN THE ONE-Y WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR NTY RI WILL BE <br /> REQUIRED TO BE GU EED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> Ins or ignature <br /> For Privately Engineered Projects Only <br /> Engineer: L~S Architects Inc. <br /> Address: 1 21 S W Salmon, Suite 100 <br /> P rtland, OR 97205 <br /> U1-19-U7 ACS: +4 I <br /> Owner: Kiefet's Barger Road LLC, Attn: Alex Jacobson <br /> Address: 15115 SW Sequoia #150 <br /> Tigard, OR 97224 <br /> DISTRIBUTION FOR F~RST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor I Engineer Owner Construction Manager File Damon Joyner, F'W M <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance- ,arming Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> O:\PROJECTS\PROJ-7V4387\Correspondence\Contractors14387 20070108 Third Notification.doc APR~t_ 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.