i 1 <br /> Final Acceptan a Puniioworks <br /> ror>inpletion of arranty Period Engineering <br /> 244 East Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> (541)682-8410 <br /> To: IUpco, Inc. Date: June 14, 2007 <br /> 90465 Wood Street <br /> Eugene OR 7402 From: Keith Jurasevich <br /> Pijoj~ect: LOT 100, ALLISON PARK <br /> C~ rjtract Number. 2006-512 Job Numbefi~ 7~ <br /> I' <br /> A warranty in pection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specifications and Standard Drawings. <br /> No defects re noted and/or were corrected the project is hereby acxepted by the City for <br /> permanent m intenance. <br /> I <br /> 05-]3-J7 AOra:07 IN <br /> 1 <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> 3 <br /> ~ngineer. H a-Burkholder Associates, LLC <br /> Address: 1 North Seventh Street <br /> ~ S ringfield OR 97477 <br /> t <br /> 1 i <br /> 1 <br /> ~J~rvner. T d Poweli <br /> Address: 1 50 Washington Street <br /> E gene OR 97401 <br /> <br /> Q:\P JEC S\PROJ-3\437 \Correspondence\Contractors\#4373-200706141anj Final Acceptance Completion o Warranty Peno oc <br /> ENG 1122 C ntractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 <br /> FinancelAccts Receivable for assessable projects or City Recorders Office for nonassessable projects <br /> <br />