New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4373 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4373 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:41:44 PM
Creation date
7/10/2008 10:09:21 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004373
GL_Project_Number
374373
Identification_Number
Begin Warranty
COE_Contract_Number
2006-00502
Retention_Destruction_Date
6/14/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(c <br /> Notification f Commencement and Puaac works <br /> <br /> • ' completion ates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> DATE CONTRACT NO. <br /> 7/5/2006 2006-512 <br /> ;PROJECT NAME JOB NO. <br /> ~ Allison Park 4373 <br /> $ ~ CONTRACTOR FEDERAL AID PROJECT N0. <br /> Kipco (Seth Bro <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> .Kim Cres 682-8473 <br /> FIRST NOTIFICA ION <br /> ~r19-06 IS THE DATE N W HICH THE CONTRACT W ORK BEGAN. inspector Signature <br /> i <br /> ,SECOND NOTIFI ATION <br /> SPECIFIED COMPLET N DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> I Punchlist #1 <br /> 1 <br /> WA WA 6/7/2006 <br /> ' L CLAIMS FOR ADDI ONAL COMPENSATION MUST BE SUBMITTED BY: <br /> SEE SUBSECTION 00 99.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> ' Inspector Signature <br /> j tHIRD NOTIFICAT ON <br /> ~ Wotice of Complet n. Begin Warranty Period. <br /> i <br /> 1X!10512008 iS THE DAT ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> NLAN'f REMOVAL, SIT CLEANUP, AND'PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> F~EQUIRED UNDER TH CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> I ~ ACCORDANCE WIT SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1'AND #2, ALL WORK IS GUARANTEED <br /> THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> ARRANTIES REMAIN N EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> NE YEAR. THE CONT CTOR iS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT ' <br /> COME EVIDENT WIT IN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR WARRANTY <br /> IOD W ILL BE REQ RED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REP " i <br /> r~ <br /> nspe r Signa <br /> For Privately Engineered Projects Only ~ <br /> ~pr,,,gmeer: Hi a-Burkholder Assoc., LLC ~ ~ ~ <br /> A~jd~dress: 15 North Seventh St. ~ ~ w'~ <br /> Sp ngfield, OR 97477 '~,.;r;~ ~ ~ ~ ~ <br /> net: La ra Foumal <br /> A dress: 17 0 Washington St. <br /> ~ , Eu ere, OR 97401 <br /> DISTRIBUTION FOR FIR T, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File <br /> A<DDITIONAL DISTRIBU ION FOR THIRD NOTIFICATION: <br /> Maintenance•Plan ktg Surely PW Administration PIC Engineering PWE As Constrict Monitor MADD Supervisor Inspector <br /> Qt\PROJECTS\PROJ-3143 3\Correspondence\Contractors\4373-20060705ThirdKC.doc APRIL 200a <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.