<br /> ' STREET LIGHT CONSTRUCTION NOTICE <br /> AGENCY: EWEB DRAWING <br /> EWER MAP E-21Q <br /> DATE: February 8, 2006 <br /> City of Euge a-PWM (Maintenance) <br /> City of Euge a-PWE (Capital& PEPI) _X <br /> Please provi a power and connect a new traffic signal at vault # 5581 by pole # 2479. This will add two <br /> 200Watt HP street lights. <br /> These plan are outlined below and shown on the attached drawing: <br /> j EWEB CONSTRUCTION PLANS <br /> ~e COBURG RAFFIC SIGNAL -PROJECT # 4366 <br /> ~ Developer's ame: Steve Korth at McKay Inv. Eugene Water & Electric Board <br /> Telephone # 485-4711 <br /> COE Rep's ame: Randal Dale Prepared By: Jerry Brule <br /> Telephone # 682-4961 Telephone 682-5522 <br /> ' PO GJN <br /> #:4366 <br /> REPLY <br /> Eugene Wat r & Electric Board <br /> I~ Attention: D bbie Crampton $6.10 x 2 = $12.20 per Mo. <br /> EI ctric Distribution Supervisor <br /> 1. Conn ct two 200 W. high pressure sodium street lights as per attached drawing and bill $ 12.20 <br /> /mont as per EWEB J-4 street light schedule. <br /> Preliminary filling is as follows: <br /> EWEB to bill Developer for the following work: <br /> Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> Transfer: $ <br /> ~I <br /> New Installa on or connect/disconnect in same box: $97 $ 97.00 <br /> Total: $ 97.00 <br /> Agency: a` K Eugene Water & Electric Board <br /> ~ -~tuthOr+~ed-t) _ _ _ _ -$y: _ _ <br /> I <br /> I <br /> 8-15-03 <br /> <br />