New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4335 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4335 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:17:20 PM
Creation date
7/10/2008 9:22:41 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004335
GL_Project_Number
374335
Identification_Number
Begin Warranty
COE_Contract_Number
2006-00516
Retention_Destruction_Date
3/7/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
`A~ <br /> v <br /> Notification of omm®ncement and Public Works <br /> Completion Dat s for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> DA E CONTRACT NO. <br /> 3/7/ 007 2006-516 <br /> PR JECT NAME JOB NO. <br /> Le re Estates 4335 <br /> C NTRACTOR FEDERAL AID PROJECT NO. <br /> E ene Sand & Grave ,Inc., PO Box 1067, Eugene OR 97440 <br /> 1N PECTOR PHONE NUMBER DATE OF AWARD <br /> GI n A. Fee 682-5195 <br /> FI ST NOTIFICATI N <br /> 05! 0/2006 IS THE DAT ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> S COND NOTIFIC TION <br /> SP CIFIEO COMPLETI DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED 8~ THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 9/07/2006 <br /> 4 CLAIMS FOR ADDI ONAL COMPENSATION MUST BE SUBMITTED BY: <br /> ( EE SUBSECTION 00 99.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS,) <br /> Inspector Signature <br /> IRD NOTIFICA ION <br /> otice of Comple ion. Begin Warranty Period. 0 3 -1 - 0 ? A 0 6 ~ I ~ d <br /> arch 7, 2007 IS THE ATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> LANT REMOVAL, SI CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> EQUIRED UNDER T E CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> I ACCORDANCE WI H SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1 AND #2, ALL WORK IS GUARANTEED <br /> Y THE CONTRALTO FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> ARRANTIES REMAI IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> NE YEAR. THE CO RACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br /> ECOME EVIDENT W THIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN TH IE-YEA WA NTY <br /> ERIOD WILL BE RE UIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAI <br /> I <br /> ~ Inspector Si na re <br /> For Privately Engineered Projects Only <br /> Engineer: Ison & Morris <br /> Address: 80 Q Street, Suite 200 <br /> pringfield, OR 97477-2120 <br /> Owner: RPD, LLC attn:Max Liebreich <br /> Address: O Box 3178 <br /> Eugene OR 97403 <br /> ISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File <br /> ADDITIONAL DIST IBUTION FOR THIRD NOTIFICATION: <br /> Maintenan .Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> <br /> Q:\PROJECTS\PROJ5\4335\Correspondence\Contractors\4335 20060907-Third Notification.doc APRIL 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.