I <br /> ~ ' /y <br /> w <br /> En eerin and <br /> g . <br /> Cons ruction Agreement Public works <br /> Engineering <br /> City of Eugene <br /> 858 Pearl <br /> Jol:~ Number. ~ ~ Contract Number. Eugene, OR swot <br /> (Sat) s82-52st <br /> Capital Project Number. FAX: <br /> Th undersigned er requests the Public Improvements as described below: <br /> Type of imp vement: Paving, wastewater, stormwater, street lights <br /> (Paving, wastewater, stormwater, street lights) <br /> Location: enore estates <br /> (Street or easement If a subdivision, print subdivision name) <br /> North or eas limit: South or west limit: <br /> (except for subdivisions) (except for subdivisions) <br /> be esigned and con rutted during the 2005 or subsequent construction season in the following manner (check one): <br /> (Year) <br /> 1. As a C engineen_d and constructed project (eligible for assessment financing). <br /> City ag s: <br /> a) to perform engineering design, cost estimate, award of contract, construction inspection, and assessment <br /> tabulation for the improvements; <br /> b) to partiapate in the cost of necessary additional capaaty of improvements beyond the assessable amounts <br /> as stipulated in the Eugene Muniapal Code. <br /> Owner green: <br /> a) to pay all engineering and construction costs which are not eligible for assessment financing. <br /> b) if the undersigned owner chooses to discontinue the City engineering and construction process prior to <br /> execution of a construction contract, the owner further agrees to pay all engineering and other project-related <br /> costs incurred by the City to that point, and to comply with paragraph 2 below, if applicable. <br /> ~ 2. Asap 'vately engineered and constructed project with private financing arranged by the Owner. <br /> Owner agrees: <br /> a to install all required public improvemerrts at no cost to the City; <br /> b to pay actual Ciiy costs incurred for plan review and processing, inspection, materials Testing, and other <br /> engineering services, all of which will be billed and payable monthly with final payment due prior to Clty's <br /> final acceptance of the completed improvements. <br /> c) to provide the City a bond, which includes aone-year warranty period, in an amount sufficient to cover all engineering and <br /> construction costs assoaated with completion of the required public improvements. <br /> d to pay other charges and levies for public improvements, if required. Other charges may include, but are not limited to: <br /> Y } penalty charges: in the event the property owner fails to make payment when due under this agreement, the property <br /> owner shall be I~arged a penalty in the amount of $25 or ten percent (10%) of the past due amount, whichever is <br /> greater. Payment of the penalty shall not consitute a waiver by the City of its other remedies. <br /> 2) interest charges: property owner shall pay interest on all past due amounts at the rate of eighteen percent (18%} <br /> per annum from the due date until paid. This sum shaft be in addition to penalty charges. <br /> PROPERTY WNER CO-0WNER CfTY OF EUGENE <br /> PR PERTY O R'S NAME p ' CO-0WNER'S NAME (pmli) SIGNA RE <br /> ~67Z <br /> St N E Max L e reich SIGNATURE T1T1E <br /> / 2U/05 Z --07 <br /> DA..{{ DATE DATE <br /> Y~ ~ l78 ' <br /> RESS ADDRESS 777PEARLSTREET <br /> u ene ~R 9 403 EUGENE, OREGON 97x01 <br /> /STATE !ZIP CITY /STATE /ZIP <br /> 41-484-1 <br /> NE NUMBER (business rs) PHONE NUMBER (buu+nBSS hours) <br /> <br /> ENGf42Q) ORIGINAL/CfTY YELLOW/OWNER PINKfINSPECTOR FEBRUARY2002 <br /> <br />