<br /> 1 <br /> STREET LIGHT CONSTRUCTION NOTICE ~ <br /> AGENCY: EWER DRAWING <br /> EWER MAP E-22N <br /> DATE: February 8, 2006 <br /> City of Eugene-PWM (Maintenance) <br /> City of Eugene-PWE (Capital& PEPI) _X <br /> Please provide power and connect a six new 200W. HPS street lights at vault # 6274 on the South side of <br /> Franklin, between Villard and 13th Ave. <br /> Remove six 200W. HPS street lights. No net change in billing. Note street light service cabinet will not be <br /> installed for a month or so. Wait until electrical service inspection notice. <br /> Also remove EWEB pole # 12512 and remove wiring to city owned poles. Move pole EWEB # 2651, and <br /> remove signal service wire from City pole # 12513. Maintain power to Traffic Signal and tighten service <br /> span after EWEB pole is moved. <br /> EWEB CONSTRUCTION PLANS <br /> EmX Franklin Section -PROJECT # 4332 <br /> Developer's Name: Larry Lindley for LTD Eugene Water & Electric Board <br /> Telephone #:501-2118 <br /> COE Rep's Name: Randal Dale Prepared By: Jerry Brule <br /> Telephone 682-4961 Telephone 682-5522 <br /> PO GJN <br /> #:4332 <br /> REPLY <br /> Eugene Water & Electric Board <br /> Attention: Debbie Crampton No net change in billing <br /> Electric Distribution Supervisor <br /> 1. Connect & disconnect six 200 W. high pressure sodium street lights as per attached drawing and <br /> bill $ 0 /month as per EWEB J-4 street light schedule. <br /> Preliminary billing is as follows: <br /> EWEB to bill Developer for the following work: <br /> Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> Transfer: $ <br /> New Installation or connect/disconnect in same box: $97 $ 97.00 <br /> Total: $ 97.00 <br /> Agency: Ci of gene Eugene Water & Electric Board <br /> Authorized by: By: <br /> <br />