STREET LIGHT CONSTRUCTION NOTICE <br /> AGENCY: EWEB DRAWING v <br /> EWEB MAP E-19R <br /> DATE: January 16, 2007 <br /> City of Eugene-PWM (Maintenance) <br /> City of Eugene-PWE (Capital& PEPI) _X <br /> Please provide power and connect 13 - 70 watt HPS street lights <br /> These plans are outlined below and shown on the attached drawing: <br /> EWEB CONSTRUCTION PLANS <br /> MEADOW BUTTE SUBDIVISION -Project #4329 -Pool Street and Abbie Lane <br /> Developer's Name: Jack Adkins, 662 Shoreline Way, Eugene Water & Electric Board <br /> Eugene OR 97401 <br /> Telephone #:687-2385 <br /> COE Rep's Name: Randal Dale Prepared By: Glen A. Fee <br /> Telephone 682-4961 Telephone 682-5195 <br /> PO Good Job # 4329 <br /> REPLY <br /> Eugene Water & Electric Board <br /> Attention: Debbie Crampton <br /> Electric Distribution Supervisor <br /> ( 13 x $3.10= $40.30) <br /> 1. Connect 13 - 70W high pressure sodium street lights as per attached drawing and bill <br /> $40.30/month as per EWEB J-4 street light schedule. <br /> Preliminary billing is as follows: <br /> EWEB to bill Jack Adkins, 662 Shoreline Way, Eugene OR <br /> 97401 for the following work: <br /> Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> Transfer: $ <br /> New Installation or connect/disconnect in same box: 10 x $47.00)+ $ 520.00 <br /> $50.00) <br /> Total: $ 520.00 <br /> Agency: Eugene Water & Electric Board <br /> Authorized by: By: <br /> <br /> 8-15-03 <br /> <br /> Q:\PROJECTS\PROJ-9\4329\Correspondence\Other\4329 20070112 StreetLightConstNtc.doc <br /> <br />