Engineering a d <br />Cb~hstruction greement <br />Public Works <br />Engineering <br />Job Number: ~~! <br />Contract Number: <br />Capital Project Number. <br />The undersigned <br />Type of <br />Location: <br />North or ea~ <br />b~ designed and cot <br />^ 1. Asat <br />City ai <br />requests the Public Improvements as described below: <br />City of Eugene <br />858 Pearl <br />Eugene, OR 97401 <br />(541)682-5291 <br />FAX: (541)682-5032 <br />~vement: Paving, curbs, wastewater and stormwater system <br />(Paving, wastewater, stormwater, street lights) <br />East Ridge Village P.U.D. <br />(Street or easement. if a subdivision, print subdivision `name) I _ (~.. <br />limit: ~~Q~ • ~~~~ ~~l ~ ~outh or west limit: ~'l~ S G 1 , ~~ G ~ I ~ l ~~• <br />(except or subdivisions) (except for subdivisions) <br />acted during the 2 0 0 2 or subsequent construction season in the following manner (check orre): <br />(Year) <br />engineered and constructed project (eligible for assessment financing). <br />a to perform engineering design, cost estimate, award of contract, construction inspection, and assessment <br />tabulation for the improvements; <br />b to participate in the cost of necessary additional capacity of improvements beyond the assessable amounts <br />as stipulated in the Eugene Municipal Code. <br />owner agrees: <br />a to pay all engineering and construction costs which are not eligible for assessment financing. <br />b if the undersigned owner chooses to discontinue the City engineering and construction process prior to <br /> execution of a construction contract, the owner further agrees to pay all engineering and other project-related <br /> costs incurred by the City to that point, and to comply with paragraph 2 below, if applicable. <br />~ 2. As a p ~ivately engineered and constructed project with private financing arranged by the Owner. <br />Owner grass: <br />a) , to install all required public improvements at no cost to the City; <br /> <br />b) i <br />to pay actual City costs incurred for plan review and processing, inspection, materials testing, and other <br /> engineering services, all of which will be billed and payable monthly with final payment due prior to City's <br /> final acceptance of the completed improvements. <br />c) to provide the City a bond, which includes sons-year warranty period, in an amount sufficient to cover ail engineering and <br /> construction costs associated with completion of the required public improvements. <br />', d) i, to pay other charges and levies for public improvements, if required. Other charges may include, but are not limited to: <br /> 1) penalty charges: in the event the property owner fails to make payment when due under this agreement, the property <br /> owner shall be charged a penalty in the amount of $25 or ten percent (10%) of the past due amount, whichever is <br /> greater. Payment of the penalty shall not consitute a waiver by the City of its other remedies. <br /> 2) interest charges: property owner shall pay interest on all past due amounts at the rate of eighteen percent (18°k) <br /> per annum from the due date until paid. This sum shall be in addition to penalty charges. <br />PROPERTY O NER CO-OWNER CITY OF EUGENE <br />Bl' C stru tion Co. <br />R'S NA~itE ( ) CO-0WNER'S NAME (print) SIGNATURE <br /> <br />ENG (42gJ <br />~GNyyT(1RE f SIGNATURE <br />_ `~'~~~~zt~Io'2. <br />DATI# -T DATE <br />~B 149, 3 Monroe Pkwy., Ste, "P" <br />rvApDFtESS ADDRESS <br />Lake Oswego,,. OR 9705 <br />CITY YSTATE /ZIP CfTV f STATE /ZIP <br />NUMBER (business <br />PHONE NUMBER (business hnursl <br />nTLE <br />DATE <br />777 PEARL STREET <br />EUGENE, OREGON 97401 <br />ORIGINAL/CITY YELLOW/OWNER PINK/INSPECTOR <br />FEBRUARY2002 <br />