<br /> <br />AGENCY: <br />City of Eugene-PWM (Maintenance) <br />City of Eugene-PWE (Capital& PEPI) _X <br />EWER DRAWING #: <br />EWER MAP #: E-20N1 <br />DATE: July 21, 2005 <br />Please complete riser and connect Traffic Signal service wires at pole # 3764 at the W. side of Alder <br />North of 11 ~' . <br />Do not connect until electrical inspector has approved service, and you have been notified by City <br />Engineering Inspector. <br />These plans are outlined below and shown on the attached drawing: <br />EWEB CONSTRUCTION PLANS <br />EmX project - New Traff c Signal at 11 & Alder -Project # 4063 <br />Developer's Name: LTD Larry Lindley <br />contact <br />Telephone #:501-2118 <br />COE Rep's Name: Debbie Clark <br />Telephone #: 682-5728 <br />PO #: GJN <br />#:4063 <br />Eugene Water & Electric Board <br />Prepared By: Jerry Brule <br />Telephone #: 682-5522 <br />REPLY <br />Eugene Water 8~ Electric Board <br />Attention: Debbie Crampton <br />Electric Distribution Supervisor <br />Two 200W. HPS lights removed and Two 200W HPS lights added. No net change to monthly billing. <br />Preliminary billing is as follows: <br />EWER to bill LTD <br />Ditch: <br />Duct: <br />Other: <br />Transfer: <br />New Installation: $40 <br />$ 40 <br />$ 40 <br />STREET LIGHT CONSTRUCTION NOTICE <br />for the following work: <br />Total: <br /> <br />Agency: -City of ge Eugene Water & Electric Board <br />Authorized by: ~~~ BY~ <br />8-15-03 <br />