~ STREET LIGHT CONSTRUCTION NOTICE <br />AGENCY: EWEB DRAWING #: <br />EWEB MAP #: E-20N2 <br />DATE: July 20, 2005 <br />City of Eugene-PWM (Maintenance} <br />City of Eugene-PW E (Capital& PEPI) _X <br />Please disconnect and connect traffic signal service wires at 10~' 8 Pearl. Contractor will remove existing <br />wires and install new wires. Coordinate with contractor (Wayne @ Lantz Electric 953-4603). Do not <br />connect until electrical inspector has approved service, and you have been notified by City Engineering <br />Inspector. <br />These plans are outlined below and shown on the attached drawing: <br />EWEB CONSTRUCTION PLANS <br />', EmX project -Traffic Signal Revision at 10 & Pearl -Project # 4063 <br />'~ Developer's Name: LTD Larry Lindley Eugene Water & Electric Board <br />contact <br />Telephone #:501-2118 <br />COE Rep's Name: Debbie Clark .Prepared By: Jerry Brule <br />Telephone #: 682-5728 ~~lephone #: 682-5522 <br />PO #: GJN <br />#:4063 <br />~, Eugene Water & Electric Board <br />Attention: Debbie Crampton ~ - `\ <br />Electric Distribution Supe' l <br />Two 200W. HPS lights remove'' `~. ~+hly billing. <br />Preliminary billing is as fol~ ~~,~.~ <br />EWEB to bill LTD ~ ~` _`.! swing work: <br />', Ditch: <br />Duct: ~ <br />Other: $ <br />Transfer: $40? $ 40 <br />New Installation: $ <br />Total: $ 40 <br />Agency: -City of Eu y~y-/ // Eugene Water & Electric Board <br />Authorized by: /~ 6/'~/~ By: <br />8-15-03 <br />