New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4063 LTD Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4063 LTD Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2008 1:39:04 PM
Creation date
7/9/2008 2:08:05 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004063
GL_Project_Number
374063
COE_Contract_Number
2002-03108
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Execution Copy <br />INTERGOVERNMENTAL AGREEMENT OF JANUARY, 2002 REGARDING <br />BUS RAPID TRANSIT <br />BETWEEN THE CITY OF EUGENE (CITY) <br />AND LANE TRANSIT DISTRICT (LTD) <br />This Intergovernmental Agreement (IGA) sets forth the general terms of an agreement between the <br />City and LTD. <br />WHEREAS, City and LTD have agreed to work cooperatively to design, construct, and maintain a <br />Pilot Project of the Bus Rapid Transit (BRT) system; and <br />WHEREAS, City and LTD have agreed to work cooperatively on the planning for future <br />improvements to the Pilot Project and on future BRT corridors within the City. <br />NOW, THEREFORE, the parties hereby agree as follows: <br />I. DEFINITION OF TERMS <br />The terms within this agreement have the following meanings: <br />1. "BRT Policy Team" means the policy team composed ofhigh-level managers from the City <br />and LTD as selected by each of them. <br />2. "BRT Steering Committee" means the advisory committee composed of: three LTD <br />Board members; one policy-level representative from each of the City, City of Springfield, <br />and Lane County; amanagement-level representative from the Oregon Department of <br />Transportation (ODOT); and two citizen representatives. <br />3. "City" means the City of Eugene. <br />4. "Conceptual Design" means the Project design, as set forth as Attachment B, existing as <br />of the date of this Agreement, to which all governmental stakeholders have given <br />preliminary approval. <br />5. "Design Team" means the team composed of architects, engineers, and other needed <br />disciplines to be engaged by LTD. <br />6. "PEPI Process" means the City's regulatory design review, compliance and inspection <br />process for privately-engineered public improvements, including all permitting and fee <br />requirements generally applicable to construction in the public right-of--way and of public <br />improvements, generally. <br />7. "Project" means the Pilot Project, as defined in Section ILA. <br />8. "Significant Changes" means those design decisions or changes to a prior approved design, <br />which the Eugene members of the BRT Policy Team identify as requiring approval by the <br />Eugene Planning Commission. <br />9. "TAC" means the currently established Technical Advisory Committee responsible for <br />design recommendations during construction of the Project. <br />10. "Within the City" means inside the City's municipal boundary or otherwise under City <br />jurisdiction, <br />Eugene -LTD IGA for Bus Rapid Transit Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.