~y <br />Erl~ineering <br />Cc~ristruction <br />- -..Y <br />rr'"• Jqb Number: _ <br />01~ice File Number: <br />regiment <br />~ Public works <br />Engineering <br />~J <br />Contract Number: <br />Capital Project Number: <br />Ttie undersigned Gwner requests the Public Improvements as described below: <br />City of Eugene <br />244 E. Broadway <br />Eugene, OR 97401 <br />(541) 687-5560 <br />FAX: (541) 984-8410 <br />TTY: (541) 687-5245 <br />Bus lane paving, curb, sidewalk, storm drain and traffic signals <br />Type of improvement: <br />(Paving, sanitary sewer, storm sewer, sidewalk, eta) <br />Location: fast 10th Ave., Mill Street and East 11th Ave. <br />(Street or easement. if a subdivision, print subdivision name) <br />s ~ Franklin Blvd. Willamette St. <br />North or east limit: South or west limit: <br />(except for subdivisions) (except for subdivisions) <br />~ 2002 <br />be designed and constructed during the or subsequent construction season in the following manner (check one): <br />(Year) <br />1. As a City engineered and constructed project (eligible for assessment financing). <br />City agrees: <br />a) ' to perform engineering design, cost estimate, award of contract, construction inspection, and assessment <br />tabulation for the improvements; <br />b) ' to participate in the cost of necessary additional capacity of improvements beyond the assessable amounts <br />as stipulated in the Eugene Municipal Code. <br />Owner a~rees: <br />a) to pay all engineering and construction costs which are not eligible for assessment financing. <br />b) if the undersigned owner chooses to discontinue the City engineering and construction process prior to <br />execution of a construction contract, the owner further agrees to pay all engineering and other project-related <br />', costs incurred by the City to that point, and to comply with paragraph 2 below, if applicable. <br />~1 2. As a priyrately engineered and constructed project with private financing arranged by the Owner. <br />Owner agrees: <br />a) Ito install all required public improvements at no cost to the Clty; <br />b) ', to pay actual City costs incurred for plan review and processing, inspection, materials tesfing, and other <br />II engineering services, all of which will be billed and payable monthly with final payment due prior to City's <br />', final acceptance of the completed improvements. <br />~ c) to provide the City a bond, which includes aone-year warranty period, in an amount sufficient to cover all engineering and <br />'construction costs associated with completion of the required public improvements. <br />~ d) '', to pay other charges and levies for public improvements, sf required. Other charges may include, but are not limited to: <br />i <br />' i 1) penalty charges: in the event the property owner fails to make payment when due under this agreement, the property <br />', owner shall be charged a penalty in the amount of S25 or ten percent (10%) of the past due amount, whichever is <br />greater. Payment of the penalty shall not consitute a waiver by the City of its other remedies. <br />j 12) interest charges: property owner shall pay interest on all past due amounts at the rate of eighteen percent (18%) <br />per annum from the due date until paid. This sum shat{ be in addition to penalty charges. <br />i <br />PROPERTY O ER CO-OWNER CITY OF EUGENE <br />a e Transit D'strict ~-t4crt'E ~ti-V:'~L' ~.5 tQ:cT <br />P P RTY WN ME ~cy~; ER' NAM ~~ ~ SIGNATURE <br />trw~ v l~ <br />SI NA URE ~~~ SIGNATUR TITLE <br />~M~y 2, 2002 (~ ~" ~ 4 <br />DA E DATE DATE <br />P 0. BOX 7070 ~ ~~_ <br />.D ROSS ADDRESS 777 PEARL STREET <br />Eragen1e~I OR 97)iO~ Q EUGENE.OREGON97401 <br />5~Tl~btt2-6100 CITY/sr lzlP <br />BrZ - ~ ~ <br />PNQNE NUMBER (business hours) PHO NUMBER (business hours) <br />ENG (4e'{9) <br />ORIGINAL /CITY YELLOW /OWNER PINK /ENGINEERING <br />AUGUST 1996 <br />