PUBLIC IMPROVEMENT CONTRACT FOR USE WITH <br /> OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION <br /> BETWEEN: The City of Eugene, an Oregon <br /> Municipal Corporation (City) <br /> AND: Wildish Construction Co.. (Contractor) <br /> CONTRACT NO.: 2008-00022 ' <br /> JOB NO.: 4423, 4433, 4483 <br /> PROJECT: 2008 PAVEMENT PRESERVATION PROGRAM <br /> CHAD DRIVE FROM EAST END TO COBURG ROAD -JOB #4423 <br /> BARGER DRIVE FROM PRIMROSE STREET TO TERRY STREET-JOB #4433 <br /> BARGER DRIVE FROM HIGHWAY 99 TO ALTIMONT STREET -JOB #4483 <br /> ~I <br /> RECITALS <br /> Contractor was the successful bidder for the contract construction of the public improvement <br /> project described in the plans and specifications for the project that were included in the bid documents ' <br /> and the Oregon Standard Specifications for Construction which form a part of this contract. ' <br /> AGREEMENT <br /> 1. The Contract. The Contract between the City and Contractor (the "Contract") includes this <br /> Document and its exhibits, together with all of the documents and materials included in the definition <br /> of the "Contract" under the 2002 Oregon Standard Specifications for Construction issued by the <br /> Oregon Department of Transportation, as modified by the City's Amendments to the Specifications, <br /> Supplemental Specifications for the Project and any other Special Provisions included in the Bid <br /> Documents (all specifications and Special Provisions included in the Contract are collectively referred <br /> to herein as the "Specifications"). In addition, the Contract between the City and Contractor shall be <br /> deemed to incorporate all reports, records, laws, rules and orders referenced in the Contract <br /> documents. <br /> This Document includes and incorporates the following Exhibits: <br /> Exhibit A -City's Standard Conditions for Public Works Contracts <br /> Exhibit B -Proposal Documents <br /> Exhibit C -Certificate of Bidder/Contractor Employee Drug Testing Program <br /> 2. Definitions. Unless otherwise specifically defined in this Document, all capitalized terms which are <br /> not proper nouns shall have the meanings assigned thereto in the Specifications. <br /> 3. Project. The project is generally described as: <br /> 2008 PAVEMENT PRESERVATION PROGRAM ON CHAD DRIVE FROM EAST END TO <br /> COBURG ROAD -JOB #4423, BARGER DRIVE FROM PRIMROSE STREET TO TERRY <br /> STREET -JOB #4433, BARGER DRIVE FROM HIGHWAY 99 TO ALTIMONT STREET -JOB I~ <br /> #4483 <br /> ORIGIN~'L <br /> <br /> Public Improvement Contract for Use with Oregon Standard Specifications -Page 1 <br /> <br /> (Revised February 2004) <br /> <br />