03/08/2004 MON 11:13 FAX 541 682 6030 CITY EUGENE PW ENG <br />~ 002/003 <br />Public Works <br />Engineering <br />City of Eugene <br />244 East Broadway <br />Eugene, Oregon 97401 <br />(541) 682-5560 <br />(541)682-8410 Fax <br />ADDENDUM N0.2 <br />TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />PAVING, CURBS, GUTTERS, SIDEWALKS, MEDIAN, STREET LIGHTS, TRAFFIC SIGNAL, <br />STREET TREES, WASTEWATER, AND STORM WATER DRAINAGE ON GARDEN WAY FROM <br />SISTERS VIEW AVENUE TO MARTIN LUTHER KING JR. BOULEVARD, AND THE NORTH SIDE OF <br />MARTIN LUTHER KING JR. BOULEVARD FROM MARCHE CHASE DRIVE TO I-5 <br />MARCH 8, 2004 JOB #3502 BID NUMBER 2 <br />TO ALL PLANHOLDERS: <br />The following changes shall amend and supplement the project bidding documents only to the extent <br />specifically shown and noted. All other conditions shall remain the same. <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this <br />addendum and the total of these bld Items then add in the appropriate place on the bid form. <br />(DELETE) PAGE 1 OF REVISED SAMPLE PUBLIC IMPROVEMENT CONTRACT <br />DATED 3/05/04 <br />(ADD) PAGE 1 OP REVISED SAMPLE PUBLIC IMPROVEMENT CONTRACT <br />DATED 3!08/04 <br />If you have questions about this addendum or the project, please call Steve Gallup at <br />(541) 682-8460. <br />All bidders shall acknowledge the receipt of and acceptance of this Addendum No. 2 by signing and <br />submitting the signed Addendum with the bid. bids submitted without this Addendum. or with the <br />Addendum not signed, will be considered informal. <br />M k Schoening, P. <br />Ciry Engineer <br />Receipt acknowledged and conditlons agreed <br />this 14 day of 1~IARCH , 2004, <br />Bidder. WILDIS NST UCT 0 CO. <br />sy: <br />Addendum #2 -Job #3502 <br />Page 1 <br />A~r~tui:n Ti~IG tidAD n t 1. tllAAd DDiAIT T1AAC AAAD 0 t t. t tAAA <br />