Run Date: 04/07/2004 14:37:57 <br />City of Eugene Page 3 <br />Contract Preliminary Progress Payment _.___ <br />, Paym+at No 005 <br />+ Contractor: WILDYSH CONST. Original Contract: $2,079,450.75 <br />Job #: 93-003502 Current Amount: $2,091,281.35 <br />Contract No: 2004-00020 Contract Award Date: 04/19/2004 <br />PO #: 2004050553 Completion Date: 09/04/2004 <br />Assessable: Yea <br />Current Contract Estimated Payment Cumulative Totals t Complete <br />Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br />0220 AGGREGATE BASS, 4 INCHES THICK $2.00 SQYD 9,100.000 $18,200.00 0.000 $0 <br />00 1 <br />163 <br /> . , <br />.500 <br />$2,367.00 <br />13.00 <br />0230 AOOR8GAT8 BASS, 6 INCB88 THICS $4.00 SQYD 625 <br /> .000 $2,500.00 851.100 $3,404.40 851.100 <br />$3,!04.40 <br />136.00 <br />0240 AGGRHGATS BASS, 7 INCHES THICK $5.00 SQYD 385.000 $1 <br />925 <br />00 0 <br />000 <br /> , <br />. . $0.00 288.300 <br />$1,441.50 <br />75.00 <br />0250 AGfAtEGi1TS BASS, 10 INCBBS THIC $6.00 SQYD 1,100.000 $6,600.00 0_000 $0 <br />00 3 <br />063 <br />700 <br /> <br />0260 <br />AGGREGATE BASS 12 INCHES THIC <br />$6 <br />50 <br />SQYD <br />18 . , <br />. $18,382.20 279.00 <br /> . 000.000 117 000.00 0.000 $0.00 16,342.500 <br />$106,226.25 <br />91 <br />00 <br />0270 STD CURS 4 GUTTBR CONCR6T8 CUR $9 <br />00 LINFT . <br /> . 7,500.000 $67,500.00 868.700 $7,818.30 7,931.700 <br />$71,385.30 <br />106 <br />00 <br />0280 8" M®IAN CONCRETE CURBS $10.00 LINFT 1,900.000 $19,000.00 1 <br />102.600 $11 <br />026 <br />00 1 <br />618 . <br /> , , <br />. , <br />.300 <br />$16,183.00 <br />85.00 <br />0290 MOUNTABLE CURB 4 GOITER CONCRS 20 <br />00 LINFT <br /> . 100.000 $2 000.00 0.000 0.00 101.500 2 030.00 101.00 <br />0300 STANDARD CONCRSTH CORHS $20.00 L121FT 100.000 $2 <br />000 <br />00 0 <br />000 <br /> , <br />. . $0.00 242.000 <br />$4,840.00 <br />2!2.00 <br />0310 VALLEY GOTTER CONCRETE $20.00 LINFT 226.000 $4 <br />520 <br />00 0 <br />000 <br /> , <br />. . $0.00 236.500 <br />$4,730.00 <br />105.00 <br />0320 DRIVEWAY CURB CUTS 3.00 LINFT 540.000 $1,620.00 0.000 $0 <br />00 548 <br />000 <br /> <br />0330 <br />EMB TOP SOIL IMPORTED <br />$20 <br />00 <br />CUYD . . 1 644.00 101.00 <br /> . 1,200.000 $24,000.00 0.000 $0.00 0.000 <br />$0.00 <br />0.00 <br />0340 GENERAL S%CAVATION $10 <br />50 CUYD <br /> . 13,800.000 $144,900.00 0.000 $0.00 12,335.000 <br />$129,517.50 <br />89.00 <br />0350 8 INCH SUBGRADg STABILIZATION $8.00 SQYD 1,100.000 $8 <br />800 <br />00 0 <br />0 <br /> , <br />. . <br />00 $0.00 6,608.800 <br />$52,870.40 <br />601.00 <br />0360 SUHGRADE GSOTSXTILB $1.00 SQYD 21,000.000 $21,000.00 0.000 $0.00 13,277.900 $13 <br />277 <br />90 6 <br /> <br />0370 <br />RIPRAP GEOTSRTILS, TYPE 2 <br />$1.00 <br />SQYD <br />600 , <br />. 3.00 <br /> .000 $800.00 0.000 $0.00 0.000 <br />$0.00 <br />0.00 <br />0380 LOOSE RIPRAP CLASS 25 20.00 TON 400.000 $8 000 <br />00 0 <br />000 <br /> . . 0.00 0.000 0.00 0.00 <br />0390 TYPE 2 FSNCB $8.00 LINPT 610.000 $4,880.00 0.000 $0 <br />00 0 <br />000 <br /> <br />0400 <br />FLAGGING <br />$30.00 <br />HOUR <br />1,500.000 <br />$45,000.00 <br />199.000 . <br />$5,970.00 . <br />1,650.000 $0.00 <br /> <br />$49,500.00 0.00 <br /> <br />110.00 <br />0410 IRRIGATION SYSTBM $35,000.00 LUMPSUM 1.000 $35,000.00 0.100 3 <br />500 <br />00 0 <br />500 <br /> <br />0420 <br />DECIDUOUS TRHS (2" CAL.) <br />$250 <br />00 <br />EACH , <br />. . 17 500.00 50.00 <br /> . 33.000 $8,250.00 0.000 $0.00 O.OOD $0.00 0.00 <br />0430 SHRUBS (5 GAL.) $30.00 EACH 56.000 $1,680.00 0.000 $0 <br />00 0 <br />000 <br /> <br />0440 <br />SHRUBS (2 GAL.) <br />12.00 <br />EACH <br />200.000 <br />$2,400.00 <br />0.000 . <br />0 <br />00 . <br />0 <br />000 $0.00 0.00 <br /> <br />0450 <br />SHRUBS (1 GAL.) <br />$9 <br />00 <br />EACH . . 0.00 0.00 <br /> . 320.000 $2,880.00 0.000 $0.00 0.000 <br />$0.00 <br />0.00 <br /> <br />