~~ <br /> Page 5 <br />Run Da te: 12/07/2004 09:32:02 <br />City of Hugene <br />~ Contract Preliminary Progress Payment <br />' payment No s 008 <br />Contractor: WILDISR CONST. <br />Job #: 93-003502 <br />Contract No: 2004-00020 <br />pp #: 2004050553 Original Contract: <br />Current Amount: <br />Contract Award Date: 04/19/2 <br />Completion Date: 09/04/2 $2,079,450.7s <br />$2,091,281.3s <br />004 <br />004 <br />Assessable: Yea <br /> <br />Line <br />Description Last Cbng Ord <br />Dnit Price <br />Unit Measure Current Contract <br />Quantity <br />Amount Estimated Payment <br />Quantity <br />Amount Cumulative Totals <br />Quantity t Complete <br />Amount <br />070o sitar, w/POST Ssoo.oo EACH al.ooo $1o,soo.oo o.ooo So.oo zi.ooo S1o,soo.oo loo.oo <br />0710 RBMOVS AND RBLNSTALL H7CISTDNG 3,500.00 LUMPSUM 1.000 $3,600.00 0.100 $350.00 1.000 $3 600.00 100.00 <br />0720 SZGNS IN PLACB $10,000.00 LDMPSUM 1.000 $10,000.00 0.100 $1,000.00 1.000 $10,000.00 100.00 <br />_~..-0730 ~~-~~CONSTRUCTION ZONE FENCING <br />100 <br />S' •. <br />-LINFT --- <br />-4',-000.000 <br />$4,000.00 <br />0.000 <br />50.00 <br />1,260.000 _ <br />$1,260.00 <br />_ 1. <br />0740 TRHB PROTECTION $1 000 00 LUMPSUM 1 000 $1 000.00 0.100 $100.00 1.000 $1 000.00 100.00 <br />0750 STRHST LIGHTS, COMPLETE $140,000.00 LUMPSUM 1.000 $160,000.00 0.100 $16,000.00 0.950 $162,000.00 96.00 <br />0760 TRAFFIC SIGNAL INSTALLATION CO $146,000.00 LOMPSVM 1.000 $146,000.00 0.100 $14,500.00 0.960 $137,760.00 96.00 <br />0770 CONNBCTION EZ PIPB SAN $100 00 EACH 1 000 $100.00 0.000 50.00 1.000_ $100.00 100.00 <br />0780 CONCRHTB SANITARY SSWBR MANHOL $2,000.00 EACH 10.000 $20,000.00 0.000 $0.00 7.000 $14,000.00 70.00 <br />0790 SEWER PIPS PVC 6• $50.00 LINPT 411.000 $20,550.00 0.000 $0.00 416.000 $20,750.00 101.00 <br />0800 SSWBR PIPB PVC 8 $33 00 LINPT 1 508 000 $49 764 00 0.000 $0.00 1,487.000 _ _ $49 071.00 99.00 <br />0810 3HWSR PIPB PVC 10" $60.00 LINPT 604.000 $30,200.00 0.000 $0.00 566.000 $28,250.00 94.00 <br />0820 TSt/SAN 6' Z 8• $75.00 8ACH 1.000 $75.00 0.000 $0.00 2.000 $150.00 700.00 <br />0830 TSB/SAN 6 % 10 $100 00 BACH 2 000 $200 00 0.000 $0.00 2.000 $200.00 100.00 <br />0810 POTHOLING $1,000.00 NCH 1.000 $1,000.00 0.000 $0.00 3.000 $3,000.00 300.00 <br />0850 AREA DRAIN, CONC $1,000.00 SACR 1.000 $1,000.00 0.000 $0.00 1.000 $1,000.00 100.00 <br />0860 CONNECT EXIST PIPB STM $100 00 EACH 1 000 $100 00 0 000 $0.00 1.000 X100.00 100.00 <br />0870 CONCRBTB INLETS, TYPE 4 A $1,000.00 BACH 32.000 $32,000.00 0.000 $0.00 33.000 $33,000.00 103.00 <br />0880 CUT ZNTO HXISTG STRDCT - STM $1,000.00 HACH 1.000 $1,000.00 0.000 $0.00 1.000 $1,000.00 100.00 <br />0890 DRAIN PIPS PVC 10 $28 00 LLNPT 1 300 000 $36 400 00 0 000 $0.00 1 034.000 $28_,952.00 80.00 <br />0900 DRAIaf PIPB PVC 12• $12.00 LINFi 267.000 $5,874.00 0.000 $0.00 517.000 $11,374.00 194.00 <br />0910 DRAIN PIPS PVC 15• $38.00 LD!IPT 1,687.000 $64,106.00 0.000 $0.00 1,684.000 $63,992.00 100.00 <br />0920 DRAIN PIPB PVC 21 S47 00 LINPT 17 000 $1 139.00 0.000 $0.00 17.000 $1 139.00 100.00 <br />0930 DRAIN PIPB RCCP 1Z" $29.00 LLNlT 2,567.000 $45,398.00 0.000 $0.00 1,075.000 $31,175.00 69.00 <br />