RLUy Date'. 02/02/2005 11:48:45 <br />Contractor: WILDISH CONST. <br />Job #: 93-003502 <br />Contract No: 2004-00020 <br />PO #: 2004050553 <br />Assessable: Yee <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Paymaat No s 010 <br />Original Contract: $2,079,450.75 <br />Current Amount: $2,091,281.35 <br />Contract Award Date: 04/19/2004 <br />Completion Date: 09/04/2004 <br />.ye 6 <br /> Current Contract Estimated Payment Cumulative Totals b Complete <br />Line Description Laet Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br />0940 DRAIN PIPB RCCP 15" $66.00 LINFT 66.000 $4,356.00 0.000 $0.00 0.000 $0.00 0.00 <br />0950 CONCRSTB CAP $13.00 LINFT 300.000 $3,900.00 0.000 $0.00 388.000 $5,04{.00 129.00 <br />0960 TSS/STM 10" X 12" $200.00 EACH 2.000 $400.00 0.000 $0.00 2.000 $400.00 100.00 <br />0970 TSE/STM 10" X 15" $150.00 EACH 3.000 $450.00 0.000 $0.00 3.000 $450.00 100.00 <br />0980 CONCRETE STORM SEWER MANHOLES $2 000.00 EACH 17.000 $34,000.00 0.000 $0.00 17.000 $34,000.00 100.00 <br /> <br />0990 TV PIPS ZNSPSCTION $1.00 LINFT 6,700.000 $6,700.00 0.000 $0.00 6,607.700 $6,607.70 99.00 <br />1000 1K HAYSAVSR SEPARATION SYS, CO $20,000.00 LUMPSUM 1.000 $20,000.00 0.000 $0.00 1.000 $20,000.00 100.00 <br />1010 SEDIMENT FENCE UNSUPPORTED $4.00 LINPT 355.000 $1,420.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />1020 CONSTRUCTION ENTRANCES $500.00 EACH 2.000 $1,000.00 0.000 $0.00 2.000 $1,000.00 100.00 <br />1030 CURB INLET SEDIMENTATION DAM $250.00 EACH 4.000 $1,000.00 0.000 $0.00 4.000 $1,000.00 100.00 <br />1040 PERMANENT SEEDING $1 600.00 ACRE 2.000 $3,200.00 0.000 $0.00 1.000 $1,600.00 50.00 <br /> <br />1050 EMULSION DUST PALLIATIVE $0.50 SQYD 3,000.000 $1,500.00 0.000 $0.00 0.000 $0.00 0.00 <br />1060 INCREASE DRIVEWAY TO 8" DEPTH 001 $70.00 CUYD 3.500 $245.00 0.000 $0.00 3.500 $245.00 100.00 <br />1070 #4 REBAR-20' STICKS 001 $6.00 BACH 120.000 $720.00 0.000 $0.00 120.000 $720.00 100.00 <br /> <br />1080 HLCCKS/TIE WIRE POR ENFORCEMEN 001 $100.00 LUMPSUM 1.000 $100.00 0.000 $0.00 1.000 $100.00 100.00 <br />1090 SET BLOCKS & TIE REBAR 001 $55.00 HOUR 24.000 $1,320.00 0.000 $0.00 24.000 $1,320.00 100.00 <br />1100 INCREASE GUTTER BAR DEPTH TO 9 001 $70.00 CUYD 1.000 $70.00 0.000 $0.00 1.000 $70.00 100.00 <br /> <br />1110 PLACE EXTRA PCC 001 $55.00 HOUR 4.000 $220.00 0.000 $0.00 4.000 $220.00 100.00 <br />1120 7.5 CY OF DRIVEWAY EXCAVATION 001 $20.00 CUYD 7.500 $150.00 0.000 $0.00 7.500 $150.00 100.00 <br />1130 EXTRA AC (ADDITIONAL 2") 001 $46.00 TON 168.600 $7,755.60 0.000 $0.00 168.600 $7,755.60 100.00 <br /> <br />1140 EXTRA GRADING FOR VARIED AGGRE 001 $1,250.00 LUMPSUM 1.000 $1,250.00 0.000 $0.00 1.000 $1,250.00 100.00 <br /> $2,091,281.35 $8,000.00 $2,055,060.13 <br />