Run Da te: 2/11/20 0:35:58
<br />Q
<br />age
<br />3
<br /> City of ne
<br /> Contract Preliminary r ogress Payment
<br /> Payment No : 011
<br />Contractor: WILDISH CONST. Original Contr act: $2,079,450.75
<br /> Job #: 93-003502 Current Amount: $2,109,179.67
<br />Contract No: 2004-00020 Contract Award Date: 04/19/2004
<br /> PO #: 2004050553 Completion Date: 09/04/2004
<br />Asaeasable: Yea
<br />
<br />Line
<br />Description Laet Chag Ord
<br />Unit Price
<br />Uait Measure Current Contract
<br />Quantity
<br />Amount Set imated Payment
<br />Quantity
<br />Amount Cumulative
<br />Quantity Totala &
<br />Amount C lets
<br />omp
<br />0220 AGGREGATE BASB, 4 INCHES THICK $2.00 SQYD 9,100.000 $18,200.00 0.000
<br />$0.00
<br />1,183.500
<br />$2,367.00
<br />13.00
<br />0230 AOGRSGATS BASS, 6 7.NCHSS THICK $4.00 SQYD 625.000 $2,500.00 0.000
<br />$0.00
<br />851.100
<br />$3,404.40
<br />136.00
<br />0240 AGGREGATH HASfi, 7 INCHES THICK $5.00 SQYD 385.000 $1,925.00 0.000
<br />$0.00
<br />288.300
<br />$1,441.50
<br />75.00
<br />0250 AGGRBGATH BASS, 10 INCHBS THIC $6.00 SQYD 1,100.000 $6,600.00 0.000 $0.00 3,063.700 $18,362.20 279.00
<br />0260 AGGREGATH BASE, 12 INCHHS THIC $6.50 SQYD 18,000.000 $117 000.00 0.000 $0.00 16 342 500 $106 226 25 91 00
<br />
<br />0270 STD CURB fi GUTTER CONCRETH CUR $9.00 LINFT 7,500.000 $67,500.00 0.000 $0.00 8,684.600
<br />$78,161.40
<br />116.00
<br />0280 8" MEDIAN CONCRETB CURBS $10.00 LINFT 1,900.000 $19,000.00 0.000 $0.00 1,618.300
<br />$16,183.00
<br />85.00
<br />0290 MOUNTABLE CURB 4 GUTTHR CONCRH $20.00 LINFT 100.000 $2 000.00 0.000 $0.00 101 500 $2 030 00 101 00
<br />
<br />0300 STANDARD CONCRETE CURBS $20.00 LINPT 100.000 $2,000.00 0.000 $0.00 242.000 $4,840.00 242.00
<br />0310 VALLEY GUTTER CONCRETE $20.00 LINFT 226.000 $4,520.00 0.000
<br />$0.00
<br />236.500
<br />$4,730.00
<br />105.00
<br />0320 DRIVEWAY CURB CUTS $3.00 LINFT 540.000 $1,620.00 0.000
<br />$0.00
<br />548.000
<br />$1 644.00
<br />101.00
<br />
<br />0330 HMB TOP SOZL IMPORTED $20.00 CUYD 1,200.000 $24,000.00 0.000 $0.00 957.000 $19,140.00 80.00
<br />0340 GENERAL EXCAVATION $10.50 CUYD 13,800.000 $144,900.00 0.000
<br />$0.00
<br />12,335.000
<br />$129,517.50
<br />89.00
<br />0350 8 INCH SIIB(1RADS STABILIZATION $8.00 SQYD 1,100.000 $8,800.00 0.000
<br />$0.00
<br />6,608.800
<br />$52,870.40
<br />601.00
<br />0360 SUBGRADE GEOTEXTILE $1.00 SQYD 21,000.000 $21,000.00 0.000 $0.00 13,277.900
<br />$13,277.90
<br />63.00
<br />0370 RIPRAP GHOTHXTILB, TYPB 2 $1.00 SQYD 800.000 $600.00 0.000 $0.00 0.000 $0.00 0.00
<br />0380 THOSE RIPRAP, CLASS 25 $20.00 TON 400.000 $B 000.00 0.000 $0.00 0 000 $0 00 0 00
<br />
<br />0390 TYPB 2 F@ICS $8.00 LINFT 610.000 $4,880.00 0.000
<br />$0.00
<br />727.000
<br />$5,816.00
<br />119.00
<br />0400 FLAGGING $30.00 HOUR 1,500.000 $45,000.00 0.000 $0.00 1,906.500 $57,195.00 127.00
<br />0410 IRRIGATION SYSTEM $35,000.00 LUMPSUM 1.000 $35,000.00 0.000 $0.00 0.900 $31 500 00 90 00
<br />0420 DECIDUOUS TREH (2" CAL.) $250.00 EACH 33.000 $8,250.00 0.000
<br />$0.00
<br />30.000
<br />$7,500.00
<br />91.00
<br />0430 SHRUBS (5 GAL.) $30.00 EACH 56.000 $1,680.00 0.000 $0.00 47.000 $1,410.00 84.00
<br />0440 SHRUBS (2 GAL.) $12.00 EACH 200.000 $2,400.00 0.000
<br />$0.00
<br />70.000
<br />$840 00
<br />35 00
<br />0450 SHRUBS (1 GAL.) $9.00 EACH 320.000 $2,680.00 0.000
<br />$0.00
<br />377.000
<br />$3,393.00
<br />118.00
<br />
|