<br />Run Date: 03j09/2005 11:15:39 Page 5
<br />City of Eugene
<br />• Contract Preliminary Progress Payment
<br />Payment No 012
<br />Contractor: WILDISH CONST. Original Contract: $2,079,450.75
<br />Job #: 93-003502 Current Amount: $2,122,485.58
<br />Contract No: 2004-00020 Cont zact Award Date: 04/19/2004
<br />pp #: 2004050553 Completion Date: 09/04/2004
<br />Assessable: Yes
<br />Current Contract Estimated Payment Cumulative Totals ~ Complete
<br />Line Description Last Chng Ord Unit Price Unit Measure Quaat ity Amount Quantity Amount Quantity Amount
<br />0700 SIGN, W/POST $500.00 EACH 21.000 $10,500.00 0.000 $0.00 21.000 $10,500.00 100.00
<br />0710 REMOVE AND RHINSTALL HXISTING $3,500.00 LUMPSUM 1.000 $3,500.00 0.000 $0.00 1.000 $3,500.00 100.00
<br />0720 SIGNS IN PLACE $10,000.00 LUMPSUM 1.000 $10,000.00 0.000 $0.00 1.000 $10,000.00 100.00
<br />0730 CONSTRUCTION ZONE F@ICING $1.00 LINFT 4,000.000 $4,000.00 0.000 $0.00 1,250.000 $1,250.00 31.00
<br />0740 TRHH PROTECTION $1 000 00 LUMPSUM 1 000 $1 000.00 0.000 $0.00 1.000 $1,000.00 100.00
<br />0750 STRE&'P LIGHTS, COMPLETE $160,000.00 LUMPSUM 1.000 $160,000.00 0.000 $0.00 1.000 $160,000.00 100.00
<br />0760 TRAFFIC SIGNAL INSTALLATION CO $145,000.00 LUMPSUM 1.000 $145,000.00 0.000 $0.00 1.000 $145,000.00 100.00
<br />0761 MISC SVCS/MATHRIALS 002 ($1 348 00) LUMPSUM 1.000 ($1 348.00) 0.000 $0.00 1.000 ($1,348.00) 100.00
<br />0770 CONNBCTION, HX PZPH - SAN $100.00 EACH 1.000 $100.00 0.000 $0.00 1.000 $100.00 100.00
<br />0780 CONCRETH SANITARY SEWER MANNOL $2,000.00 EACH 10.000 $20,000.00 0.000 $0.00 7.000 $14,000.00 70.00
<br />0790 SEWHR PIPE PVC 6" 50.00 LINFT 411.000 $20,550.00 0.000 $0.00 415.000 $20,750.00 101.00
<br />0800 SHWBR PIPH PVC 8• $33.00 LINFT 1,508.000 $49,764.00 0.000 $0.00 1,487.000 $49,071.00 99.00
<br />0810 SEWER PIPS PVC 10" $50.00 LINFT 604.000 $30,200.00 0.000 $0.00 565.000 $28,250.00 94.00
<br />0820 TH8/SAN 6• Z 8• S75.00 EACH 1.000 $75.00 0.000 $0.00 2.000 5150.00 200.00
<br />0830 THH/SAN 6" X 10" $100.00 HACH 2.000 $200.00 0.000 $0.00 2.000 $200.00 100.00
<br />0840 POTHOLING $1,000.00 EACH 1.000 $1,000.00 0.000 $0.00 3.000 $3,000.00 300.00
<br />0850 AREA DRAZN CONC $1 000 00 HACH 1 000 $1 000.00 0.000 $0.00 1.000 $1,000.00 100.00
<br />0860 CONNBCT HXIST PIPE - STM $100.00 HACH 1.000 $100.00 0.000 $0.00 1.000 $100.00 100.00
<br />0870 CONCRHTB INLSIS, TYPH 4 A $1,000.00 EACH 32.000 $32,000.00 0.000 $0.00 33.000 $33,000.00 103.00
<br />0880 CUT INTO HXISTG STRUCT - STM $1,000.00 BACH 1.000 $1,000.00 0.000 $0.00 1.000 $1,000.00 100.00
<br />0990 DRAIN PIPH PVC 10" $28.00 LINFT 1,300.000 $36,400.00 0.000 $0.00 1,034.000 $28,952.00 80.00
<br />0900 DRAIN PIPE PVC 12• $22.00 LIRPT 267.000 $5,874.00 O.Q00 $0.00 517.000 511,374.00 191.00
<br />fl910 DRAIN PIPHPVf 15" $38.0.0,. . LINFT 1 687.000 $69,106.00 64.000 $2,432.00 1,748.000 $66,424.00 104.00
<br />0920 DRAIN PIPE PVC 21" - $67.00 LINPT 17.000 $1,139-.00 0.000_ $0.00 17.000 $1,139.00 100-00