Run Date: 07/01/2005 13:20:31 Page 7 <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No 014 <br />Contractor: WILDISH CONST. Original Contract: $2,079,450.75 <br />Job #: 93-003502 Current Amount: $2,122,485.58 <br />Contract No: 2004-00020 Contract Award Date: 04/19/2004 <br />PO #: 2004050553 Completion Date: 09/04/2004 <br />Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals & Complete <br />Line Description Last Chug Ord Unit Price Uait Measure Quantity Amount Quantity Amount Quantity Amount <br />0970 TEEJSTM 10• K 15" $150.00 EACH 3.000 $450.00 0.000 $0.00 3.000 $450.00 100.00 <br />0980 CONCRETE STORM SEWHR MANHOLES $2,000.00 EACH 17.000 $34,000.00 0.000 $0.00 17-000 $34,000.00 100.00 <br />0990 TV PIPE INSPECTION $1.00 LINFT 6,700.000 $6,700.00 0.000 $0.00 6,607.700 $6,607.70 99.00 <br />L000 1K BAYSAVER SHPARATION SYS CO $20 000 00 LUMPSUM 1 000 $20 000 00 0 000 $0.00 1-000 20 000.00 100.00 <br />1010 SEDIMENT PENCE, UNSUPPORTED $4.00 LINFT 355.000 $1,420.00 0.000 $0.00 0.000 $0.00 0.00 <br />1020 CONSTRUCTION ENTRANCES $500.00 EACH 2.000 $1,000.00 0.000 $0.00 2.000 $1,000.00 100.00 <br />1030 C[B2B INLET SSDIMIHNTATION DAM $250.00 EACH 4.000 $1,000.00 0.000 $0.00 4.000 $1,000.00 100.00 <br />1040 PERMANENT SEIDING $1,600.00 ACRE 2.000 $3,200.00 0.000 $0.00 1.000 $1,600.00 50.00 <br />L050 BM[JI,SION DUST PALLIATIVH $0.50 SQYD 3,000-000 $1,500.00 0.000 $0.00 0.000 $0.00 0.00 <br />L060 INCREASE DRIVEWAY TO 8" DEPTH OD1 $70.00 CUYD 3.500 $245.00 0.000 $0.00 3.500 $245.00 100.00 <br />L070 #4 RHBAR-20' STICKS 001 $6.00 EACH 120-000 $720.00 0.000 $0.00 120.000 $720.00 100.00 <br />L080 BLOCKS/TIH WIRE FOR ENFORCE!ffi4 001 $100.00 LUMPSUM 1.000 $100.00 0.000 $0.00 1.000 $100.00 100.00 <br />1090 SET BLOCKS 6 TIE REBAR 001 $55.00 HOUR 24.000 $1,320.00 0.000 $0.00 24.000 $1,320.00 100.00 <br />1100 INCREASE GUTTER HAR DEPTH TO 9 001 $70.00 CUYD 1.000 $70.00 0.000 $0.00 1.000 $70.00 100.00 <br />L110 PLACH EXTRA PCC 001 $55.00 HOUR 4.000 $220.00 0.000 $0.00 4.000 $220.00 100.00 <br />L120 7.5 CY OF DRIVEWAY EXCAVATION 001 20.00 CUYD 7.500 $150.00 0.000 $0.00 7.500 $150.00 100.00 <br />L130 EXTRA AC (ADDITIONAL 2") 001 $46.00 TON 168.600 $7,755.60 0.000 $0.00 168.600 $7,755.60 100.00 <br />1140 HXTRA GRADING FOR VARIED AGGRE 001 $1,250.00 LUMPSUM 1.000 $1,250.00 0.000 $0.00 1.000 $1,250.00 100.00 <br />.150 PIPH CONFLICTS-4/27 002 $264.45 LUMPSUM 1.000 $264.45 0.000 $0.00 1.000 $264.45 100.00 <br />.160 PIPE CONFLICTS-4/28 002 $1,391.29 LUMPSUM 1.000 $1,391.29 0.000 $0.00 1-000 $1,391.29 100.00 <br />~ ~ 1 <br />