<br />Rua Date: 11/08/2005 09:51:14 <br />Contractor: WILDISH CONST. <br />Job #: 93-003502 <br />Contract No: 2004-00020 <br />PO #: 2004050553 <br />Assessable: Yes <br /> <br />City of Hugene <br />Contract Preliminary Progress Payment <br />Payment No 016 Final Pay <br />Original Contract: $2,079,450.75 <br />Current Amount: $2,143,376.61 <br />Contract Award Date: 04/19/2004 <br />Completion Date: 09/04/2004 <br />Current Contract Hatimated Payment Cumulative Totals <br />Line Description Last Cling Ord Uait Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br />Page B <br />t Complete <br />1170 PIPH CONFLICTS-4/29 002 $1,024.89 LUMPSUM 1.000 $1,024.89 0.000 $0.00 1.000 $1,024.89 100.00 <br />1180 PLUG/REMOVE HXZSTING PIPH 002 $248.18 LUMPSUM 1.000 $248.18 0.000 $0.00 1.000 $248.18 100.00 <br />1190 UTILITY CONFLICTS, STM LATERAL 002 $658.17 LUMPSUM 1.000 $658.17 0.000 $0.00 1.000 $658.17 100.00 <br />1200 RHMOVS SIMPSON HOUSING FHHCS 002 $753.05 LUMPSUM 1.000 $753.05 0.000 $0.00 1.000 $753.05 100.00 <br />1210 ADD HARS/DOWELS TO CfiG CONC. I 002 $2,995.29 LUMPSUM 1.000 $2,995.29 0.000 $0.00 1.000 $2,995.29 100.00 <br />1220 INSTALL WOOD PSNCH 002 $1,366.20 LUMPSUM 1.000 $1,366.20 0.000 $0.00 1.000 $1,366.20 100.00 <br />1230 IRRIGATION SLHEVSS 002 $3.78 LINPT 95.000 $359.10 0.000 ~ $0.00 95.000 $359.10 100.00 <br />1240 CHANGE PIPS MATERIAL 003 ($568.51) LUMPSUM 1.000 ($568.51) 0.000 $0.00 1.000 ($568.51) 100.00 <br />1250 BARRIER/MBDZAN CHANGB 003 $4,840.23 LUMPSUM 1.000 $4,b40.23 0.000 $0.00 1.000 $4,840.23 100.00 <br />1260 ODOT ADS OVERPASS STM DRAIN 003 $3,923.74 LUMPSUM 1.000 $3,923.74 0.000 $0.00 1.000 $3,923.74 100.00 <br />1270 4000 PSI CONC PRICE R®UCTION 003 ($1,129.32) LUMPSUM 1.000 ($1,129.32) 0.000 $0.00 1.000 ($1,129.32) 100.00 <br />1280 INSHRTA THSS 003 $702.01 LUMPSUM 1.000 $702.01 0.000 $0.00 1.000 $702.01 100.00 <br />1290 DRIVHWAY 313 S. GARDEN WAY 003 $1,765.25 LUMPSUM 1.000 $1,765.25 0.000 $0.00 1.000 $1,765.25 100.00 <br />1300 DRIVHWAY 123 S GARDBN WAYRBM/R 003 $652.30 LUMPSUM 1.000 $652.30 0.000 $0.00 1.000 $652.30 100.00 <br />1310 LANDSCAPING VANDALISM 004 $1,587.00 LUMPSUM 1.000 $1,587.00 0.000 $0.00 1.000 $1,587.00 100.00 <br />1330 SIDHWALK/ADA RAMP 9WSSTWARD HO 004 $1,667.64 LUMPSUM 1.000 $1,667.64 0.000 $0.00 1.000 $1,667.64 100.00 <br />1340 HLECTAZCAL WORK ITHMS 004 $1,449.36 LUMPSVM 1.000 $1,449.36 0.000 $0.00 1.000 $1,449.36 100.00 <br />1350 CRHDIT TO CITY, E% 1-1/2" COND 004 ($2,400.00) LUMPSUM 1.000 ($2,400.00) 0.000 $0.00 1.000 ($2,400.00) 100.00 <br />1360 HORH 3 IRRIGATION SLHBVES 004 $1,611.00 LUMPSUM 1.000 $1,611.00 0.000 $0.00 1.000 $1,611.00 100.00 <br />1370 _ MLK CURB/G[TPfHR RH4/RSPL 005 $1 131.92 LUMPSOM 1.000 $1 131.92 0.000 $0.00 1.000 $1,131.92 100.00 <br />