New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3502 Nichols Consulting Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3502 Nichols Consulting Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:55:33 PM
Creation date
7/9/2008 10:26:53 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003502
GL_Project_Number
985014
Identification_Number
2003100443
COE_Contract_Number
2003-00218
Retention_Destruction_Date
10/25/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />-2- <br />December 18, 2002 <br />Task 2 -Perform Both Pavement Reconstruction and Overlay Structural Design Reports <br />NCE will use the FWD data collected on the two streets to develop a pavement design. Deflection data <br />as well as core results and soil testing results will be analyzed for a standard asphaltic concrete <br />reconstruction and overlay design and will be prepared in accordance with AASHTO design <br />procedures. <br />Typical design considerations and issues such as those below will be addressed and included in the <br />designs: <br />• Will base repairs be required? If so, how much? <br />• Milling requirements <br />• Types of asphalt concrete to be used <br />• Use of crack sealants <br />• Use of pavement geotextiles <br />• Recommendations for failed areas (digouts) <br />The recommendations will be summarized in a bound report and submitted to the City for review and <br />comment. Following review of these items by the City, any necessary adjustments will be made and a <br />final report will be submitted to the City. NCE proposes to complete the Draft Pavement Design <br />Report by January 24, 2003 and submit it to the City. After comments have been received back from <br />the City, NCE will complete the Final Report within a week of receiving the comments and deliver to <br />the City for final approval. <br />Total Cost for Task 2: 56,690 <br />The total cost for the two tasks to complete the pavement designs is 511,363. <br />If you have any questions or if there is additional information I need to send to you please call me at <br />(253) 383 - 2322. We at Nichols Consulting Engineers look forward to working with you on this <br />project. <br />Sincerely, <br />~~ € , <br />Paul E. Sachs <br />Division Manager <br />Nichols Consulting Engineers <br />Approved by <br />.3~` <br />Ci Of Eugene <br />Nichols Consulting Engineers, Chtd. <br />Parement 8 Miterizis En6ineerina <br />
The URL can be used to link to this page
Your browser does not support the video tag.