.;. <br />EUGENE SAND & GRAVEL, INC. <br />GENERAL ESTIMATE SUMMARY <br />PROJECT: <br />City of Eugene -Steve Gallup <br />LOCATION:; <br />FILENAME: <br />Garden Way Pothole work on 11!24!03 <br />(see attached daily COE memo) <br />C:1My Documentstpayestlmatest[Eugene -Garden Way Potholes.xls]ShasN <br />10 Pick-Up (112 ton) 1 HR $16.00 $16A0 <br />~ 20 1 ton UtilityJJCrew Truck 1 HR $20.00 $20.00 <br />~U Backhoe 58010perator 5.5 HR $64.00 $352.00 <br />40 Backhoe/Whacker 580/Operator 0 HR $72.00 $0.00 <br />50 Trackhoe/Operator (40,000 #j JD 490 0 HR $83.00 $0.00 <br />60 Trackhoe/Operator (50,000 #j JD 590 0 HR $90.00 $0.00 <br />70 Trackhoe/O~erator (60,000 #) JD 690 0 HR $96.00 $0.00 <br />80 Trackhoe/Operator (70,000 #) JD 892 0 HR $115.00 $0.00 <br />j90 Dozer D3/Operator 0 HR $74.00 $0.00 <br />;100 Dozer D5/Operator 0 HR $88.00 $0.00 <br />10 Dozer D7/Operator 0 HR $120.00 $0.00 <br />f120 Huber/Operator 0 HR $72.00 $0.00 <br />130 Grader 120 G/Operator 0 HR $75.00 $0.00 <br />140 Grader 140,G/Operator 0 HR $83.00 $0.00 <br />150 Water Truck/Oriver 0 HR $69.00 $0.00 <br />~I60 6-8 ton Dirt Vib. Roller/Operator 0 HR $85.00 $0.00 <br />'170 Wheel Loader, 2 cylOperator, JD 544 0 HR $79.00 $0.00 <br />180 Wheel Loader, 3 cy/Operator, JD 644 0 HR $80.00 $0.00 <br />;190 5 yd. Dum Truck/Operator 5.5 HR $53.00 $291.50 <br />'200 10 yd. Dum~ Truck/Operator 0 HR $55.00 $0.00 <br />210 10 yd. Dump Truck W/Pup Trailer/Operator 0 HR $65.00 $0.00 <br />'220 Roto-Miller 0 SY $4.00 $0.00 <br />230 Move Truck & Trailer/Operator 0 HR $69.00 $0.00 <br />240 Rented Dump Trucks 0 HR $58.00 $0.00 <br />250 By-Pass Pump, 3" Outlet 0 HR $14.00 $0.00 <br />260 De-Waterirkg Pump 2" Outlet 0 HR $15.00 $0.00 <br />280 Trench Box 0 HR $16.00 $0.00 <br />290 Manhole Box 0 HR $16.00 $0.00 <br />300 Straight time Labor 13.0 HR $36.50 $474.50 <br />310 Flagging 11.0 HR $30.00 $330.00 <br />320 314"-0 Crushed Rock 6.31 TON $4.45 $28.08 <br />330 1 1/2"-0 Crushed Rock 0 TON $4.10 $0.00 <br />340 3"-0 Crushed Rock 0 TON $5.50 $0.00 <br />350 C.D.F. 0 TON $39.00 $0.00 <br />358 UPM High',Pertormance Cold Mix Asphalt 2.30 TON $68.00 $156.40 <br />360 CI. "C" Asphalt 0 TON $30.00 $0.00 <br />850 Sawcutting 1 LS LS $110.00 <br />1 <br />i SUBTOTAL ........................ $1,778.48 <br />TOTAL PROJECT ............... $1,778.48 <br />