<br /> <br />_~tTY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order <br />CONTRACTOR: WILDISH CONSTRUCTION CO. <br />(ADDRESS) P 0 BOX 7428 <br />Eugene, OR 97401.0428 <br />PROJECT: Paving, curbs, gutters, sidewalks, median, street lights, traffic signal, <br />street trees, wastewater, antl stone water drainage on Garden WaY from <br />Sisters View Ave. to Martin Luther King Jr. Blvd. north side of Martin Luther <br />King Jr. Bivd. from Marche Chase Drive to I.5 <br />You are directed to make the following changes in this contract: <br />Job # 3502 <br />Contract # <br />Change Order # <br />Date: 2004.20 <br />1 <br />07/20104 <br />CAMS Date: <br />Reviewed b : <br />Date: <br />Inspector: John Bonham _ <br /> Paioe Dickinson ~ <br />Proj. Mgr. Steve Gallu ~~ <br />Principal Eng. Paul Klooe <br />Item <br />No. Item Time <br />Change Quantity <br />(Units) Unit <br />Cost <br />Amount <br />(+/.) Amended <br />Change Net <br />Change <br /> Ori final 0.00 0.00 0.00 ;0.00 <br /> Revised 0.001 0.00 0.00 <br />1060 Increase Drivewa s to 8" De th 0 Amended 3.50 ICY $70.00 $245.00 ;245.00 <br /> Orl final 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 ; 0.00 0.00 <br />1070 #4 Rebar - 20' Sticks 0 Amended 120.00 (Each $6.00 $720.00 $720.00 <br /> Ort final 0.00 ' 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br />108D Sup I misc. blocks & tie wire for Reinfo ant 0 Amended 1.00 ,LS $100.00 ;100.00 $100.00 <br /> Orl Inal 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br />1090 Set blocks & Tie Rebar D Amended 24.00 ,HR $55.00 $1320.00 ;1,320.00 <br /> On Inal 0.00 , 0.00 0.00 $0.00 <br /> Revised 0.001 0.00 0.00 <br />1100 Increase Gutter Bar Depth to 9" 0 Amended 1.00 CY $70.00 ;70.00 $70.00 <br /> Orl final 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br />1110 Place Extra PCC 0 Amended 4.00 HR $55.00 $220.00 ;220.00 <br /> Ori final 0.00 0,00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br />1120 7.5 CY of drlvewa excavation 0 Amended 7.50 ICY $20.00 $150.00 $150.00 <br /> Oh anal .00 0.00 0.00 $0.00 <br /> Revised 0.00 ; 0.00 0,00 <br />1130 Extra AC (additional 2") 0 Amended 168.60 ¢46.00 ;7,755.60 $7 755.60 <br /> 011 Inal .00 ~ 0.00 0.00 ;0.00 <br /> Revised 0,00 0.00 0.00 <br />1140 Extra radio for varied a re ate structure 0 Amended 1.00 ILS $1,250.00 $1,250.00 $1 250.00 <br /> Ori final 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 ; 0.00 0.00 <br /> 0 Amended 0.00 $0.00 $0.00 $0.00 <br />The original contract work days are o.0 da <br />The contract time change this C.O o.o da <br />The contract time change by previous C.O.'s o.o da <br />The new contract work da s are o.o da s <br /> <br />The original contract sum was <br />......... <br />................. <br />. <br />... <br /> <br />Net change by previous change order .. <br />. <br />.................... <br />................... <br />.. .......................................................... <br /> <br />Net change due to amendment by previous cha .. <br />... <br />nge order .......................................................... <br /> <br />The contract sum prior to this change order was .. <br /> <br />.......................... .......................................................... <br /> <br />...... <br />. <br />. <br /> <br />This change order will change contract sum by this amount <br />.. . <br />.... <br />............................................. <br />...... <br />.. <br /> <br />The new contract net change sum . ....... <br />.......................................... <br /> <br />The new contract amendment sum ... ......................................................... <br />The new contract sum including this change order will be <br />.. <br />...... .... <br />. <br />Percents a of on final contract . <br />............ .... <br />NET CHANGE DUE TO AME DMENTS ................ .......................................................... <br />App val by: <br />%~~~• ~// <br />City <br />ngineer Prime " ctor <br />7~ <br />~ ~~ ¢ <br />Date Dat <br />^ CONTRACTOR ^ OFFICE FILE ^ PURCHASINGICRO <br />$2,079,450.75 <br />$0.00 <br />$o.oo <br />$2,079,450.75 <br />$11,830.60 <br />$o.Do <br />$11,830.60 <br />$2,091,281.35 <br />0.57% <br />0,57% <br />Third Party <br />Date <br />This changes the bid items as follows: <br />Contract Contract <br />