„• <br />W <br />f- a <br />4 <br />AMENDMENT #1 <br />CONTRACT 2002-03809 <br />EUGENE MULTI-MODAL STATION -Initial Group Process <br />WBGS Architecture & Planning <br />The above referenced Personal Services Contract Between Owner and Architect is amended in the <br />following manner. <br />1. Under 1.4, add: <br />1.4.1 Prepare and process Determination of Eligibility historic evaluation. <br />1.4.2 Provide as-built drawings of the existing Station and Mail Shed and provide an as <br />built plan of the Express building. <br />1.4.3 Evaluate if code will require seismic upgrade for the Station during rehabilitation <br />2. Amend the Time For Completion Date to read June 30, 2002 <br />3. All other terms and conditions of this contract shall remain unchanged. <br />City of Eugene Contractor <br />David N. Reinhard <br />Transportation Division Manager <br />Date: // <br />• --__. <br />Eric Gunderson, Principal <br />WBGS Architecture & Planning, PC <br />Date: ~ 0 <br /> <br />