New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3825 WBGS Contract 2002-03809
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3825 WBGS Contract 2002-03809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2008 3:33:30 PM
Creation date
7/8/2008 3:42:04 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
003825
GL_Project_Number
905173
Identification_Number
2002100107
COE_Contract_Number
2002-03809
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br />David Evans and Associates, Inc. Rate Schedule A <br />Calendar Year 2001 <br />Staff Classification Direct OH 10.50% Total <br /> Labor Rates 173.92% Fee Billing Rate <br />Principal $52.00 $90.44 $14.96 $157.39 <br />Senior Project Manager $52.00 $90.44 $14.96 $157.39 <br />Senior Engineer/Planner $43.00 $74.79 $12.37 $130.15 <br />Project EngineerlPlanner $35.00 $60.87 $10.07 $105.94 <br />Design Engineer/Planner $27.00 $46.96 $7.77 $81.72 <br />Senior DesignerlTechnician $26.00 $45.22 $7.48 $78.70 <br />Technician/Draftperson $22.00 $38.26 $6.33 $66.59 <br />Research Assistant $20.00 $34.78 $5.75 $60.54 <br />Office/Administrative Support $17.75 $30.87 $5.11 $53.73 <br />Construction Proj. Manager $31.00 $53.92 $8.92 $93.83 <br />Senior Construction Inspector $28.00 $48.70 $8.05 $84.75 <br />Construction Inspector $26.00 $45.22 $7.48 $78.70 <br />Construction Advisor $38.50 $66.96 $11.07 $116.53 <br />Project Surveyor $30.50 $53.05 $8.77 $92.32 <br />Survey Technician $21.50 $37.39 $6.18 $65.08 <br />Survey Crew (3 person) $59.50 $103.48 $17.11 $180.10 <br />Surve Crew (2 erson) $43.00 $74.79 $12.37 $130.15 <br />David Evans and Associates, Inc. Rate Schedule B <br />Calendar Year 2002 <br />Staff Classification Direct OH 10.50% Total <br /> Labor Rates 173.92% Fee Billing Rate <br />Principal $55.00 $95.66 $15.82 $166.47 <br />Senior Project Manager $55.00 $95.66 $15.82 $166.47 <br />Senior Engineer/Planner $46.00 $80.00 $13.23 $139.23 <br />Project Engineer/Planner $37.50 $65.22 $10.79 $113.51 <br />Design Engineer/Planner $29.00 $50.44 $8.34 $87.78 <br />Senior Designer/Technician $27.00 $46.96 $7.77 $81.72 <br />Technician/Draftperson $23.50 $40.87 $6.76 $71.13 <br />Research Assistant $20.80 $36.18 $5.98 $62.96 <br />Office/Administrative Support $19.00 $33.04 $5.46 $57.51 <br />Construction Proj. Manager $33.25 $57.83 $9.56 $100.64 <br />Senior Construction Inspector $30.00 $52.18 $8.63 $90.80 <br />Construction Inspector $27.75 $48.26 $7.98 $83.99 <br />Construction Advisor $41.25 $71.74 $11.86 $124.86 <br />Project Surveyor $32.75 $56.96 $9.42 $99.13 <br />Survey Technician $22.50 $39.13 $6.47 $68.10 <br />Survey Crew (3 person) $61.88 $107.62 $17.80 $187.30 <br />Surve Crew (2 erson $44.75 $77.83 $12.87 $135.45 <br />eug amtrak rates.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.