New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 3825 PBS Contract 2003-00305
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN 3825 PBS Contract 2003-00305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2008 3:15:28 PM
Creation date
7/8/2008 3:05:18 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
003825
GL_Project_Number
905173
Identification_Number
2003014302
COE_Contract_Number
2003-00305
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PBS <br />GENERAL TERMS AND CONDITIONS FOR PROFESSIONAL SERVICES <br />Attlached to and part of our letter agreement to client outlining our specific scope of services: <br />Thy purpose of these General Terms and Conditions is to identify basic contractual obligations of PBS and Client for various <br />~rgfessional consulting services, whereby PBS would be acting in the role of ConsultandOwner Representative for Client. <br />ndividual projects may require additional detailed descriptions of services to be provided as a supplement to this agreement. <br />Y. ' RJATE SCHEDULE: Fees for services are based on the number of hours expended on the project, including travel, by PBS personnel <br />' nhie anv reimtluTSfl111C eXDenSCS. <br />Reaulaz Rate <br />ReQUlar Rate <br />' 1. Principal Engineer/Scientist $125.00 9. Project Geologist/Scientist 75.00 <br />2. Sr. GeotechnicaVSoils Engineer 105.00 10. Field Engineer/Scientist 70.00 <br />3. Sr. EnvironmentaUCivil Engineer 95.00 11. Industrial Hygienist/Inspector 65:00 <br />4. Environmental Planner/Permitting Specialist 90.00 12. GIS/GPS Mapping 70.00 <br />5. Sr. Industrial Hygienist/Toxicologist 90.00 13. Field/IH Technician 50.00 <br />6. Sr. Scientist/I~iydrologisdGeologist 85.00 14. CAD/Drai3ing 50.00 <br />7. Project Manager/Designer 85.00 15. Computer Programmer 80.00 <br />8. Project Engineer/Chemist 85.00 16. Administrative Support 45.00 <br />* Note: Personnel in Categories 10 thru 16 will chnege time exceeding eight hours per day and weekends at 125% of the regular <br />' hourly rate. Court and arbitration time will be charged at two times above rates. <br />2. REIMBURSABLE EXPENSES: <br />A. Outside Services. Subcontracted services such as subconsultants, labor, and technical services will be invoiced at cost plus 15 <br />percent. Examples of services which may be subcontracted include other professional disciplines, soil boring, well installation, <br />heavy and specialty equipment operators, geophysical surveys, and computer programming. <br />' B. Su lies. Charges for items not ordinarily famished by PBS such as expendable equipment, rental equipment, subsistence, travel <br />expenses, tolls, special fees, reproduction, permits, licenses, priority mail fees, and long-distance and wireless telephone calls will <br />' be invoiced at cost plus 10%. <br />C. ui ment. Certain PBS-owned equipment (for sampling, testing, personal protective equipment, vehicle mileage, photocopying, <br />etc.) maybe required to complete the project. These will be invoiced at our standard rates without markup (rates available upon <br />request). Current rates are as follows: vehicle mileage is $0.42 per mile; photocopies are $0.15 per copy; color copies aze $1.00 <br />per copy. These rates are subject to change without notice. <br />', ; ~. Laboratory. PBS utilizes both in-house and outside laboratories for sample analysis. We maintain a list of standard rates for sample <br />analyses commonly utilized in conjunction with our services (available upon request). <br />3. RIGHT OF ENTRY: Unless otherwise agreed, the Client will furnish PBS right-of-entry on real property and be responsible for the <br />propriety of the time, place, and manner of our entry upon the real property where we are to perform our services. PBS will take <br />reasonable precautions to minimize damage to the real property from use of equipment, but have not included in the fee the cost of <br />restoration, unless specifically included in our. scope of work. If the Client desires PBS to restore the real property to its approximate <br />former condition, we will accomplish this and add the cost plus 15 percent to our fee. <br />A. ,BURIED UTILITIES: PBS field personnel are trained to initiate field testing, drilling and/or sampling within a reasonable distance <br />of each designated utility location. PBS field personnel will avoid hazards or utilities which are observed by them at the site. If PBS is <br />advised in writing of the presence or potential presence of underground or overground obstructions, such as utilities, we will give special <br />instructions to our field personnel. PBS is not responsible for any damage or toss due to undisclosed or unknown surface or subsurface <br />conditions owned by client or third parties. The client will hold PBS and PBS subcontractors harmless from any loss resulting from <br />inaccuracy of markings, of plans, or lack of plans, relating to the location of utilities. Note: Utility locates typically require 48 hours to <br />2 full working days advance notice. <br />5. WORKER'S OMPENSATION INSURANCE: PBS will provide Worker's Compensation insurance (and/or Employer's Liability <br />insurance) as required by state statutes. <br />C:\WMDOWS\7EMP\TC3oo2.doc Rev. 8/2002 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.