New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3825 Murphy Harris Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3825 Murphy Harris Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2008 2:15:18 PM
Creation date
7/8/2008 2:54:56 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
003825
GL_Project_Number
905173
Identification_Number
2005100125
COE_Contract_Number
2005-03814
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Architect ~, <br />Contractor ^ <br />Project Manager ^ <br />CHANGE ORDER NUMBER: ONE _ ~„„,,,C;r~, _ u <br />iPR~oJECT: Eugene Depot Cabling <br />433 Willamette St. <br />Eugene Oregon, 97401 <br />coNTftACroR: 49 CMS rphy Harris Co. ISSUE GATE: 09/08/04 <br />Springfield OR 97477 CONTRACT NUMBER: 2005-03814 <br />~ k3JN: 3825 CONTAGT: Jim Murphy CONTRACT DATE: 08/18/04 <br />736-1292 <br />Thy Contract is changed as follows: <br />tTEM # DESCRIPTION COST <br /> <br />1.1 Add data outlet for future kiosk -faceplate 2 $117.00 <br />1.2 Add cabling for payphones $75.00 <br />1.3 Upgrade cabling for reader boards from cat5e to 20/2 shielded $75.00 <br />1.4 Extend dial tone from 66 block bracket to 110 block and add bracket at 66 block $110.00 <br />1.5 Provide standard rack instead of swing gate radk ($40.00) <br />1,6 Provide 2 rad< shelves $152.00 <br />1.7 Provide tsobarl2 rack mount surge supression power strip $190.00 <br />TOTAL THIS CHANGE ORDER: )678.00 <br />The original Contrail Sum was ..................... <br />............................................................................... .. $4,935.00 <br />Net change by previously authorized Change Order ....................................................................................................................... <br />Net than b $0.00 <br />9e Y Previously authorized Change Order ........................... . <br />........................................................ $0.00 <br />The Contrail Sum prior to this Change Order was .................. ~~~~•~~~~~~~~•~~~~~ <br />The Contract Sum will be increased by this Change Order ...................................................................................................... $4,935.00 <br />The new Contrail Sum including this Change Order will be............ ............................................................................................... ;679.00 <br />....................................... $5,614.00 <br />.............................................. <br />The Contrail Time will unchanged <br />The date of Substantial Com tenon as of the date of this Chan a Order therefore is: <br />ENTER DATE HERE 06/08/04 <br />CONTRACTOR: OWNER: <br />Murphy Harris Co. ,,,~„ _~ <br /> <br />Not valid until signed by the <br />and Owner. <br />date: /6' ~ ~fL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.