New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3825 Lile-Eugene Moving & Storage Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3825 Lile-Eugene Moving & Storage Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2008 2:14:57 PM
Creation date
7/8/2008 2:47:24 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
003825
GL_Project_Number
905173
Identification_Number
2005100155
COE_Contract_Number
2005-03815
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHyANGE ORDER NUMBER: ONE <br />w <br />PROJECT: Eugene Depot MOVIng coNTRACTOR: Lile-Eugene Moving A Storage ISSUE DATE: 09/14/04 <br />433 Willamette St. 330 Roosevelt Blvd <br />Eugene Oregon, 97401 Eugene OR. 97402 coNTRACr NuMeER: 2005-03815 <br />GJN: 3825 CONTACT: Richard Kimball CONTRACT DATE: 08/14/04 <br />The Contract is changed as follows: <br />ITEM # DESCRIPTION COST <br />1.1 additional labor to box up benches $880.80 <br />TOTAL THIS CHANGE ORDER: 5880.80 <br />The original Contract Sum was ......................................................................................................................................................... $1,467.50 <br />Net change by previously authorized Change Order ....................................... .......... $0.00 <br />...................................................................... <br />Net change by previously authorized Change Order ....................................................................................................................... $0.00 <br />The Contrail Sum prior to this Change Order was .......................................................................................................................... $1,467.50 <br />The Contract Sum will be increased by this Change Order ...................................................................................................... $880.80 <br />The new Contract Sum including this Change Order will be ............................................................................................................ $2,348.30 <br />The Contract Time will unchanged <br />The date of Substantial Completion as of the date of this Change Order therefore is: ENTER DATE HERE 09/14/04 <br />CONTRACTOR: <br />Llle-Eugene Moving ~ Storage <br />330 Roosevelt Blvd <br />Eugene OR. 97402 <br />I <br />OWNER: <br />City of Eugene <br />Faality Management Division <br />210 Cheshire Avenue <br />of valid until signed by the Contractor, and Owner. <br />~:ity Recorder's Office.8( <br />Architect ^ <br />Contractor ^ <br />Project Manager ^ <br />Copy/File ^ <br />date: ~d,~4-/ ~" <br />