GHAI~GE ORDER NUMBER: ONE <br />ROJ~CT: Relocate Bunkhouse CONTRACTOR: Chris Schoap Building Movers ISSUE DATE: 11/228/03 <br />Eugene Depot PO Box 2768 <br />433 Willamette Street Eugene Oregon PROJECT NUMBER: 3825 <br />Eugene, OR 97401 Atn Chris Schoap <br />CONTRACT DATE: 11/07/03 <br />The Contract is changed as follows: <br />ITEM # DESCRIPTION COST <br />Delete covering roof with plastic sheeting and cover it with "wafer-board" placed "shingle-style" and <br />secured with screws to framing <br />$360.00 <br />TOTAL THIS CHANGE ORDER: $360.00 <br />The original Contract Sum was ........................................................................................................................................................ $6,200.00 <br />00 <br />Net change by previously authorized Change Order ........................................................................................................................ $0. <br />The Contract Sum prior to this Change Order was .......................................................................................................................... $6,200.00 <br />The'Contract Sum will be increased by this Change Order ....................................................................................................... $360.00 <br />The new Contract Sum including this Change Order will be ............................................................................................................ $6,560.00 <br />The date of Substantial Completion as of the date of this Change Order therefore is: ENTER DATE HERE 12/15/03 <br />CONTRACTOR: <br />Chris Schoap Building Movers <br />PO Box 2768 <br />Eugene, OR 97402 <br />B: <br />Date: ~~ VJ <br />OWNER: <br />City of Eugene <br />Facility Management <br />210 Cheshire <br />Eugene, OR 97401 <br />~,,,,,iot valid until signed by the Contractor and Owner. <br />