Bach-Lewin Inc. Rate Schedule A <br />Cal radar Year 2004 <br /> Direct OH 10.50% Total <br />Sta Classification Labor Rates 1.34% Profit Billing Rate <br />Pri cis al $53.00 $71.02 $13.02 $137.04 <br />Project Manager $33.00 $44.22 $8.11 $85.33 <br />Engineering Manager $30.00 $40.20 $7.37 $77.57 <br />Project Engineer ~ $28.00 $37.52 $6.88 $72.40 <br />Enc,~ir7eering Assistant $20.50 $27.47 $5.04 $53.01 <br />Ser~igr Drafter $25.00 $33.50 $6.14 $64.64 <br />CA~ Drafter $17.00 $22.78 $4.18 $43.96 <br />CleFical <br />i $17.00 $22.78 $4.18 $43.96 <br />per diem, mileage: Per Prime Contractor's Established Rates/Allowances. <br />See Exhibit A Part 2 of 3. <br />Nonlabor Costs: Actual Costs Billed as Accrued to Maximum <br />`~r ', <br />Eugene Multi-modal Transit Station Amendment 2 9 of 13 <br />