New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3825 WBGS Contract 2002-00304
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3825 WBGS Contract 2002-00304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2008 3:33:14 PM
Creation date
7/8/2008 2:09:29 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
003825
GL_Project_Number
905173
Identification_Number
2002100484
COE_Contract_Number
2002-00304
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Addendum 2 to Exhibit A -Statement of Work and Delivery Schedule, Part 1 of 3 <br />Section D - Detailed Work Tasks, Part 2 -Description of Tasks <br /> <br />~!. <br />Near Term Site Improvements -General Description -Provide Construction Engineering architectural <br />services for the improvements listed below including design, costing, construction contract documents, cost <br />negotiation with contractor, construction administration, and record documents. Review submittals shall be <br />made at 25% and 65%. 100% construction documents will be submitted. Cost estimates shall be made at 65% <br />completion of contract documents. Facilitate for land use compliance, building permits, Section 106 submittal <br />to SHPO for approval of menu of improvements. Issue a proposal request to the ODOT Depot general <br />contractor and negotiate terms to incorporate items into the current ODOT contract for construction, as funds are <br />available. <br />1. Rehabilitate Existing Bunkhouse -Relocate, rehabilitate, preserve to provide durable service, and <br />accommodate work and storage needs for Amtrak train crews. Improve site to within 10 feet of building. <br />Provide water and sanitary sewer from depot sources on site, and electrical power and telephone/data conduit <br />from the depot building. Include shelving or cabinetry, accommodations for the Union Pacific Track Warrant <br />computer data system, seated work space, and ahand-washing sink. PBS Environmental has determined there <br />are no asbestos containing materials in this building. <br />2. Depot Plaza -Paving, surface water drainage, bollards, curbing treatments, lighting, general seating, seating <br />or planters as dividers between plaza and platform. Electrical power, water and drainage for food vendors as <br />may occur. Electrical power as may be needed for entertainment events. <br />3. South-Central Sidewalk -Configure to allow option of seating at small chairs and tables with bypassing <br />pedestrian traffic, streetlights, and possible barrier or landscape elements at parking. The concrete walk <br />configuration should accommodate subsequent paving project without rebuilding. <br />4. South-West Sidewalk & Trash and Recycling Enclosures -Concrete sidewalk paving etc. as in South- <br />Central Sidewalk with surface drainage, lighting, trash, seating, bike parking and other amenities. Durable <br />enclosure for general trash containers and fenced area for recycling bins, possible need for water, drainage and <br />power. <br />S. Other Site Improvements -These items include general pavement seal-coating and traffic markings <br />throughout, and possible selective paving repairs in the west half of the site. <br />Information available to the design team prepared by others <br />a) Neer Term Site Use Diagram <br />b) AutoCAD files of the Bunkhouse the city developed for the Historic Property Moving application. <br />c) Lead Survey Report prepared by PBS for the Bunkhouse <br />Eugene Multi-modal Transit Station Amendment 2 <br />3of13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.