`~ <br />City of Eugene <br />Facility Management <br />Closed Work Order Report <br />WO Number: 43477 Status: COMP Actual Finish: 04/21/2004 Report Date: 04/20/2004 <br />Department: CS Division: FAC Worktype: GJN Leadcraft: LOCK <br />Contact: Russ Mecre Phone: 6024 Approved by: Russ Mecredy <br />GJN:3825 GL Account:311-9336-905173 <br />Location: 3601: Eugene Railway Station <br />Description: 'Remove pulls from pr of exit leafs at south side of temp. <br />Amtrak designated a pr of doors on the south side at the temp as exit only. Customers are pulling on doors, causing <br />'.Exterior pulls need to be removed without affecting exit panics at inside. Salvage pulls to Kielty in construction of <br />Actual Hours: 2.50 <br />Actual Labor: 122.50 <br />Actual Material: 6.00 <br />Total Cpst: 128.50 <br />Labor Detail <br /> Regular OT Pay Line <br />Date 'Memo Hours Hours Rate Cost <br />04/21/2004 Repaired latching mech. 1.50 0.00 49.00 73.50 <br />04/22/2004 Remove handles, adjust 1.00 0.00 49.00 49.00 <br />Total 122.50 <br />Material Detail <br /> Unit Line <br />Description Cost Quantity Cost <br />Hardware/ stock 6.00 1.00 6.00 <br />Total 6.00 <br />CLOSED <br />~~~ <br /> <br />Date Printed:5/3/2004 <br />Page: l <br />